FIR13-00252
| INSP-Sprinkler Rough-in | 8/6/2013 | 8/6/2013 | 8/6/2013 4:43:34 PM | P | PART |
|
|
UG fire supply line from the point of connection at the street to the stem wall okayed for bury.
|
FIR13-00382
| INSP-Sprinkler Rough-in | 8/6/2013 | 8/6/2013 | 8/6/2013 4:42:17 PM | P | PART |
|
|
Fire sprinkler work at the drop ceilings approved for cover.
|
FIR13-00355
| INSP-Sprinkler Rough-in | 8/6/2013 | 8/6/2013 | 8/6/2013 4:41:31 PM | P | PART |
|
|
Overhead work approved for cover at the drop ceilings.
|
BLD13-01343
| FIRE-Final Inspection | 8/5/2013 | 8/6/2013 | 8/6/2013 4:40:41 PM | A | PASS |
|
|
Fire life safety inspection completed. Exit sign at the double doors to be refaced, post fire extinguishers at locations discussed.
|
FIR13-00299
| INSP-Conference | 8/5/2013 | 8/6/2013 | 8/6/2013 1:23:20 PM | P | DONE |
|
|
On site conference regarding review note item #7, and conditions per NFPA 13 24.2.1.6.
|
BLD13-02068
| FIRE-Final Inspection | 8/5/2013 | 8/6/2013 | 8/6/2013 12:45:11 PM | A | PASS |
|
|
Life safety finaled.
|
BLD13-01642
| FIRE-Final Inspection | 8/6/2013 | 8/6/2013 | 8/6/2013 12:44:21 PM | P | PASS |
|
|
Noted correction items verified for completion. Life safety passed.
|
FIR13-00305
| INSP-Sprinkler Rough-in | 8/5/2013 | 8/6/2013 | 8/6/2013 12:43:19 PM | A | PART |
|
|
Tenting inspection completed satisfactory- okay to cover overhead rough-in.
|
FIR13-00299
| INSP-Sprinkler Rough-in/Hydro | 8/5/2013 | 8/6/2013 | 8/6/2013 12:00:00 AM | P | CANC |
|
|
cesar Phone #: ###-####
|