FIR12-00691
| FIR-Aging Inspection | 8/6/2013 | 8/6/2013 | 8/8/2013 1:37:54 PM | | NR |
|
|
work is in progress
|
FIR13-00365
| INSP-Final Inspection | 8/6/2013 | 8/6/2013 | 8/6/2013 3:49:04 PM | P | PASS |
|
|
Permit finaled
|
FIR13-00184
| INSP-Sprinkler Rough-in | 8/5/2013 | 8/6/2013 | 8/6/2013 3:39:34 PM | P | PASS |
|
|
Todays inspection verified that the seismic bracing had been installed on the gridded system in the Cafeteria. This included the branchlines and the far main.
|
BLD13-01905
| FIRE-Conference | 8/5/2013 | 8/6/2013 | 8/6/2013 3:30:01 PM | A | DONE |
|
|
Conference was to verify that no sprinkler modifications are needed around the new office.
|
BLD13-01223
| FIRE-Final Inspection | 7/23/2013 | 8/6/2013 | 8/6/2013 12:04:28 PM | A | PASS |
|
|
Life safety passed
|
FIR13-00347
| INSP-Final Inspection | 8/6/2013 | 8/6/2013 | 8/6/2013 12:03:44 PM | P | PASS |
|
|
permit finaled
|
FIR12-00177
| FIR-Aging Inspection | 8/6/2013 | 8/6/2013 | 8/6/2013 9:31:47 AM | | NR |
|
|
work is in progress
|
FIR13-00037
| INSP-Sprinkler Rough-in | 8/5/2013 | 8/6/2013 | 8/6/2013 8:31:57 AM | A | PASS |
|
|
See the city approved plans for additional areas on the second floor where sprinkler piping can be covered. First floor needs the ceiling tile removed so that a rough-in inspection can be performed.
|