BLD14-01091
| FIRE-Final Inspection | 8/6/2014 | 8/6/2014 | 8/7/2014 11:32:01 AM | P | PASS |
|
|
Fire life safety inspection passed.
|
BLD14-00796
| FIRE-Conference | 8/6/2014 | 8/6/2014 | 8/6/2014 4:48:03 PM | P | DONE |
|
|
On site conference with contractor regarding fire life safety conditions and inspection items necessary for final. Noted door hardware issues, one exit sign to be repaired, noted curtain partitions are not yet installed and may create obstructions to fire alarm and sprinkler coverage.
|
FIR14-00438
| INSP-Final Inspection | 8/5/2014 | 8/6/2014 | 8/6/2014 4:41:34 PM | A | PASS |
|
|
Verified previous correction items. Functional testing passed. Fire alarm permit finaled.
|
BLD14-00512
| FIRE-Final Inspection | 8/4/2014 | 8/6/2014 | 8/6/2014 4:39:54 PM | P | PASS |
|
|
Fire life safety inspection passed.
|
FIR13-00723
| INSP-Sprinkler Rough-in | 8/6/2014 | 8/6/2014 | 8/6/2014 4:39:26 PM | P | PART |
|
|
Okay to cover fire sprinkler work at the 1st floor lobby ceiling and aeronautics office as marked and dated on plans. Noted one head to be relocated at the west open office area.
|
FIR14-00103
| INSP-Supply line flush | 8/6/2014 | 8/6/2014 | 8/6/2014 1:38:32 PM | P | CANC |
|
|
Jeremiah is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
FIR14-00103
| INSP-Sprinkler Rough-in/Hydro | 8/6/2014 | 8/6/2014 | 8/6/2014 1:38:30 PM | P | CANC |
|
|
This is an ug hydro. Jeremiah is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
FIR13-00460
| INSP-Final Inspection | 8/6/2014 | 8/6/2014 | 8/6/2014 11:47:52 AM | A | PASS |
|
|
UG fire supply line flush completed satisfactory. Scope of permit work finished. Permit finaled.
|
FIR14-00308
| INSP-Final Inspection | 8/4/2014 | 8/6/2014 | 8/6/2014 10:59:55 AM | A | PASS |
|
|
Fire alarm work passed inspection and testing. Permit finaled.
|
FIR14-00285
| INSP-Final Inspection | 8/5/2014 | 8/6/2014 | 8/6/2014 10:59:10 AM | A | PASS |
|
|
Fire sprinkler permit work passed final walkthrough.
|
BLD14-00119
| FIRE-Final Inspection | 8/5/2014 | 8/6/2014 | 8/6/2014 10:58:25 AM | A | PASS |
|
|
Fire life safety inspection completed satisfactory.
|
FIR14-00497
| INSP-Alarm Testing | 8/5/2014 | 8/6/2014 | 8/6/2014 10:57:32 AM | A | PART |
|
|
Functional testing completed acceptable. Final pending location of smoke detectors at the north and south corridors 154 and 162 east side of the new fire doors. Relocate away from HVAC diffusers or delete and meet NFPA 72 17.7.5.6.1.
|
FIR14-00270
| INSP-Sprinkler Rough-in | 8/5/2014 | 8/6/2014 | 8/6/2014 10:51:20 AM | A | PART |
|
|
Overhead work at the front office area grid ceilings approved for cover. Need to adjust spacing at three locations in warehouse 117 per plan annotations- four heads exceed min. spacing, one head overspaced off new demising wall.
|
FIR14-00327
| INSP-Final Inspection | 8/5/2014 | 8/6/2014 | 8/6/2014 9:18:46 AM | A | PASS |
|
|
Scope of work completed. Fire sprinkler permit finaled.
|