FIR13-00252
| INSP-Final Inspection | 8/5/2015 | 8/6/2015 | 8/6/2015 2:48:32 PM | P | PASS |
|
|
Pump installed dedicated to the fire system, fire sprinkler inspection passed/complete
|
FIR14-00837
| INSP-Final Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 2:09:56 PM | P | PASS |
|
|
Previously noted items corrected, fire alarm inspection passed/complete
|
FIR15-00483
| INSP-Final Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 1:29:20 PM | P | PASS |
|
|
Fire sprinkler inspection passed/complete
|
BLD15-02668
| FIRE-Final Inspection | 8/4/2015 | 8/6/2015 | 8/6/2015 1:18:57 PM | A | PASS |
|
|
Life fire safety passed/complete
|
BLD15-01370
| FIRE-Final Inspection | 8/5/2015 | 8/6/2015 | 8/6/2015 12:10:52 PM | A | FAIL |
|
|
Ceiling tiles are not in place, leaving the CPVC piping in tenant space exposed. Appears that a horn/strobe was added with no FIR permit. General contractor informed me that the horn/strobe was existing but according to the city approved plans, the existing horns/strobes are indicared on the plan, the horn and strobe in questions looks to be a newly installed device, not shown on the demo plan.
|
FIR15-00519
| INSP-Final Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 12:05:54 PM | P | PASS |
|
|
Fire sprinkler final fire inspection passed/complete
|
FIR15-00519
| INSP-Sprinkler Rough-in | 8/5/2015 | 8/6/2015 | 8/6/2015 12:04:51 PM | P | PASS |
|
|
Rough to cover inspection passed/complete, approved for cover.
|
BLD15-02240
| FIRE-Final Inspection | 8/5/2015 | 8/6/2015 | 8/6/2015 10:55:28 AM | A | FAIL |
|
|
Tried calling POC, Darin phone # ###-####, no answer, left a message on his voicemail, proceded to tenant space, no one at tenant space, door is locked, inspection failed.
|
BLD15-01153
| FIRE-Final Inspection | 8/5/2015 | 8/6/2015 | 8/6/2015 10:30:27 AM | A | PASS |
|
|
Life fire safety passed/complete
|
FIR14-00529
| INSP-Sprinkler Rough-in | 8/5/2015 | 8/6/2015 | 8/6/2015 9:58:57 AM | A | PART |
|
|
24 hour air test started at 0845, 42 psi on dry system one, 43 psi on dry system two.
|
FIR15-00394
| INSP-Final Inspection | 8/5/2015 | 8/6/2015 | 8/6/2015 9:32:59 AM | P | PASS |
|
|
Fire sprinkler inspection passd/complete
|
FIR15-00097
| INSP-Final Inspection | 8/5/2015 | 8/6/2015 | 8/6/2015 9:31:57 AM | A | PASS |
|
|
Fire sprinkler inspection passed/complete
|
FIR14-00532
| INSP-Final Inspection | 8/6/2015 | 8/6/2015 | 8/6/2015 8:33:30 AM | A | PASS |
|
|
Final fire alarm inspection passed/compete
|
FIR15-00469
| INSP-Final Inspection | 8/5/2015 | 8/6/2015 | 8/6/2015 8:04:51 AM | A | PASS |
|
|
Final fire sprinkler inspection passed/complete
|