Inspections for the day of: Tuesday, August 6, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02407 BLD-Concrete8/5/20198/6/20198/6/2019 3:10:44 PMPPASS
rebar- after 2:30pm please- Doug Phone #: ###-####. Ties replaced. ok.
BLD18-02407 BLD-Foundation8/6/20198/6/20198/6/2019 3:09:45 PMPPASS
rebar- after 2:30pm please- Doug Phone #: ###-####
BLD19-02088 BLD-Wall Bracing8/6/20198/6/20198/6/2019 2:15:52 PMPPASS
Gari Phone #: ###-####
BLD19-01896 BLD-Energy code compliance8/6/20198/6/20198/6/2019 1:35:57 PMPPASS
Kai Phone #: ###-####
BLD19-01896 BLD-Framing/Rough-in8/6/20198/6/20198/6/2019 1:35:47 PMPPASS
Kai Phone #: ###-####
BLD19-01682 BLD-Footing8/5/20198/6/20198/6/2019 1:02:21 PMAPART
Phone #: ###-#### Inspection requested via web by Shawn Plimmer. Perimeter footings. Noted that SE footing was not the required 24inch width. Work in progress on repair. Ok to place concrete. Will verify footing width on stemwall inspection.
BLD18-03906 BLD-Wall cover8/6/20198/6/20198/6/2019 12:22:45 PMPCANC
Look at the roof wall bracing. Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
MIS19-00234 BLD-Conference8/5/20198/6/20198/6/2019 11:36:35 AMAPASS
MIS19-00234 DOC - Permit Finaled8/6/20198/6/20198/6/2019 11:34:45 AMPPASS
Plans have been submitted for remodel. Work being done at time of visit is minor demo and replaceing waynes coating in janotors closet.
BLD18-04131 BLD-Final8/5/20198/6/20198/6/2019 8:32:51 AMAPASS
You will need to call Dave ###-#### AND code 0688 for the front door lock box. Phone #: ###-#### Inspection requested via web by Brandon Sorensen. OK for perm occ.