| Electrical Rough-In | 8/5/2020 | 8/6/2020 | 8/6/2020 2:17:04 PM | P | PASS |
|
|
This is for a ceiling rough-in inspection. Jack Carl (electrician) is the contact. Thank you Phone #: ###-#### Inspection requested via web by A.M.E. Office Ceiling rough in ok cover
|
ELE20-01740
| Final | 8/6/2020 | 8/6/2020 | 8/6/2020 1:45:11 PM | P | PASS |
|
|
Furniture installed Final
call Lance with questions 208.703.2035 Phone #: ###-#### Inspection requested via web by David Feller City approved plans on site. Final ok
|
ELE20-02716
| Rough-In Permanent Service | 8/6/2020 | 8/6/2020 | 8/6/2020 1:14:58 PM | P | PASS |
|
|
Please call if you need. Thanks, Jeff Creek ###-#### Phone #: ###-#### Inspection requested via web by Andrea Creek Rough in ok cover p/s u/g n ok
|
ELE19-03526
| Final | 8/4/2020 | 8/6/2020 | 8/6/2020 12:33:48 PM | P | PASS |
|
|
Power could not be brought to the sign location. Sign was installed with the electrical capped inside the sign. Phone #: ###-#### Inspection requested via web by Danny Pardee Final ok
|
ELE19-03526
| Electrical Rough-In | 8/6/2020 | 8/6/2020 | 8/6/2020 12:33:35 PM | P | PASS |
|
|
Power could not be brought to the sign location. Sign was installed with the electrical capped inside the sign. Phone #: ###-#### Inspection requested via web by Danny Pardee Listing and disconnect confirmed if energized in future. Rough in ok
|
ELE20-02300
| Conference | 8/6/2020 | 8/6/2020 | 8/6/2020 11:53:01 AM | A | PASS |
|
|
Conference visit to discuss routing of feeders for 3rd and 4th floor apartments and the units 5/6/7/8 that sit above them and materials to be used. Also pre-inspect on 3rd and 4th floor apartment walls Phone #: ###-#### Inspection requested via web by Jason Parke Decided not to pre-inspect units, Discussed the wiring methods required when running from type 1 construction to type 3 construction. As per 338.10(B)(4) SE cable shall be installed as per 334 part 2. 334.10(5)- NM and SER cable OK to be installed in type 1 and 2 construction as long as installed in a raceway rated for these types of construction. As per annex E types 1 and 2 construction wiring methods shall be of non- combustible type. Flexible metal conduit OK. Short runs of conduits or raceways OK as per 300.10 ex1, 300.12, 300.16(B), bushing required where cable emerges for raceway. 250.86 ex2- addition bonding not required.
|
ELE19-03829
| Electrical Rough-In | 8/5/2020 | 8/6/2020 | 8/6/2020 10:30:28 AM | A | PASS |
|
|
3rd floor ceiling in the restrooms Contact electrician onsite Shawn Evins. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Need to verify listing for level 10 pathway lighting. Accesses for junction boxes shall be a minimum of 22"x22" as per 110.26(A)(4). Level 3 bathroom hardlids, west stair wall from level 5 to lower level 9 and level 10 electrical room walls rough in ok cover.
|