ELE20-02800
| Electrical Rough-In | 8/6/2020 | 8/6/2020 | 8/6/2020 2:12:35 PM | P | PASS |
|
|
Uffer Inspection Phone #: ###-#### Inspection requested via web by Bryan Atkins ufer only ok to cover
|
ELE20-00081
| Permanent Service | 8/6/2020 | 8/6/2020 | 8/6/2020 1:39:56 PM | P | PASS |
|
|
Front door is unlocked you might have to turn a little tiny V-shaped handle nobody lives there. House smells any questions let me know thank you Phone #: ###-#### Inspection requested via web by David Kubik Grounding updated as per prior inspection. p/s o/h rec ok
|
ELE20-00081
| Final | 8/6/2020 | 8/6/2020 | 8/6/2020 1:32:02 PM | P | PASS |
|
|
Front door is unlocked you might have to turn a little tiny V-shaped handle nobody lives there. House smells any questions let me know thank you Phone #: ###-#### Inspection requested via web by David Kubik final ok
|
ELE20-02735
| Permanent Service | 8/6/2020 | 8/6/2020 | 8/6/2020 1:13:18 PM | P | PASS |
|
|
This is a service change on an existing home and we need to get power back on today... I believe we can be ready for you by 1:30, 2:00 this afternoon. Call me if you have any questions, thank you... Phone #: ###-#### Inspection requested via web by Rick Beckman 200A meter/main existing 2in mast, new service entrance, 2 ground rods and water pipe. Did not do anything to existing sub panel. exterior work only p/s o/h rec ok
|
ELE20-02590
| Final | 8/6/2020 | 8/6/2020 | 8/6/2020 12:58:36 PM | P | PASS |
|
|
ok with video/photo // Homer Phone #: ###-#### final ok
|
ELE20-01356
| Final | 8/6/2020 | 8/6/2020 | 8/6/2020 12:44:24 PM | P | NR |
|
|
screened - call ahead // Marcello Phone #: ###-#### Need Bulbs in entry Chand, install Living ceiling fan, TV box above FP, Exterior light on man cave blanked, front entry can installed.
|
ELE20-02649
| Permanent Service | 8/4/2020 | 8/6/2020 | 8/6/2020 11:58:04 AM | A | PASS |
|
|
Upgrading service from 125 amps to 200 amps. shutdown starts between 9am-10am, should be ready for inspection by noon. Electricians will be on site for inspection. Please call Caleb with any questions or concerns. ###-#### Phone #: ###-#### Inspection requested via web by Caleb Gaylord 200A meter/main mounted on exterior of house. Grounding complete. Contractor was pulling in feeders to sub panel at time of inspection. Will need to look at sub panel wiring at final p/s u/g rec ok
|
ELE20-00493
| Electrical Rough-In | 8/6/2020 | 8/6/2020 | 8/6/2020 11:28:26 AM | P | PASS |
|
|
Contact: Wes Powell Phone #: ###-#### Inspection requested via web by Deb Gooden conference room soffits only ok to cover
|
ELE20-02009
| Final | 8/5/2020 | 8/6/2020 | 8/6/2020 10:59:52 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Thomas wilson frame bond complete final ok
|
ELE20-02008
| Final | 8/5/2020 | 8/6/2020 | 8/6/2020 10:59:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Thomas wilson frame bond complete final ok
|
ELE20-01977
| Final | 8/5/2020 | 8/6/2020 | 8/6/2020 10:59:03 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Thomas wilson frame bond complete final ok
|
ELE20-01240
| Final | 8/3/2020 | 8/6/2020 | 8/6/2020 10:42:36 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jonathan Poot final ok
|
ELE20-01240
| Electrical Rough-In | 8/6/2020 | 8/6/2020 | 8/6/2020 10:42:27 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jonathan Poot rough in ok
|
ELE20-02716
| Electrical Rough-In | 8/6/2020 | 8/6/2020 | 8/6/2020 10:28:18 AM | P | CANC |
|
|
Please call if you need. Thanks, Jeff Creek ###-#### Phone #: ###-#### >> Inspection requested via web by Andrea Creek Inspection cancelled from web by: Andrea Creek
|
ELE20-02779
| Final | 8/5/2020 | 8/6/2020 | 8/6/2020 10:17:57 AM | A | FAIL |
|
|
Homeowner is Cliff, please reach out to give him 45-hr heads up please. ###-####. Thanks, Greg. Phone #: ###-#### Inspection requested via web by Greg Traudt 210.52B2. Small appliance circuit shall have no other outlets. 406.9 Receps installed in wet locations shall be llisted type W/R. ( weather proof recep added on small appliance circuit and non-wr)
|
ELE20-02792
| Rough-In Permanent Service | 8/5/2020 | 8/6/2020 | 8/6/2020 10:15:36 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Schroder rough in ok p/s u/g n ok
|
ELE19-01688
| Permanent Service | 8/5/2020 | 8/6/2020 | 8/6/2020 9:45:33 AM | A | PASS |
|
|
Screened- Jamon Phone #: ###-#### All documentation received. Breaker testing complete, afci rating ok. p/s u/g n ok
|
ELE19-04630
| Final | 8/5/2020 | 8/6/2020 | 8/6/2020 9:17:30 AM | A | FAIL |
|
|
lock box is located on trellace near front door. code is 4810. there is a key for the front door and the garage door Phone #: ###-#### Inspection requested via web by Ryan Wake 110.26E1a Dedicated equipment space, equal to width and height from floor to ceiling shall be dedicated to electrical equipment only. No piping shall be installed in this area.(Water heater drain line, Spoke to contractor about issue at time of rough in) 210.8 All bath receps shall be GFCI protected.(Both up bath vanities) 110.7. Back deck GFCI will not reset, red light flashing. Front weatherproof is dead.
|
ELE20-02747
| Temporary Service | 8/5/2020 | 8/6/2020 | 8/6/2020 8:31:11 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson
|
ELE20-02746
| Temporary Service | 8/5/2020 | 8/6/2020 | 8/6/2020 8:31:02 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson
|