MEC20-03282
| Final | 8/4/2020 | 8/6/2020 | 8/6/2020 3:39:06 PM | P | PASS |
|
|
INSTALLER DAVID ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace a/c coil co locking caps ok- virtual video onsite- 5lb flue pass
|
MEC20-01236
| Rough-in | 8/5/2020 | 8/6/2020 | 8/6/2020 3:11:10 PM | P | PASS |
|
|
please call Shawn prior to arrival for access. thanks, Phone #: ###-#### Inspection requested via web by Nicholas Paige- phase 2 all rooms flex registers and seal ok- ok for ceiling tiles all areas- call in final when ready
|
MEC20-03315
| Final | 8/6/2020 | 8/6/2020 | 8/6/2020 2:28:04 PM | P | PASS |
|
|
Gas package unit in backyard. Homeowner Jerri Adams ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- outdoor package unit co ok
|
MEC20-03065
| Rough-in | 8/6/2020 | 8/6/2020 | 8/6/2020 1:58:16 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak 1- firecaulk range duct thru floor and extend below framing in kitchen 2- seal all boots 3rd floor 3- access platform 24" wide and 30x30 in front of unit and unobstructed 4- 1st floor bath fan needs to be 3 feet from property line and relocated
left notice
|
MEC20-03066
| Rough-in | 8/6/2020 | 8/6/2020 | 8/6/2020 1:56:06 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak 1- seal all boots 3rd floor 2- access platform 24" wide and 30x30 in front of unit and unobstructed 3- firecaulk range duct thru floor and route below framing in kitchen 4- exhaust fan 1st floor needs to be 3' from property line needs relocated
left notice
|
MEC20-03064
| Rough-in | 8/6/2020 | 8/6/2020 | 8/6/2020 1:54:08 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 1- seal all boots 3rd floor 2- extend access platform in attice to all the way accross front of unit
left notice
|
MEC20-03064
| Pressure Test | 8/6/2020 | 8/6/2020 | 8/6/2020 1:53:10 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass tagged meter location
|
MEC20-03066
| Pressure Test | 8/6/2020 | 8/6/2020 | 8/6/2020 1:52:51 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass tagged meter location
|
MEC20-03065
| Pressure Test | 8/6/2020 | 8/6/2020 | 8/6/2020 1:52:06 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass tagged meter location
|
MEC20-03067
| Rough-in | 8/6/2020 | 8/6/2020 | 8/6/2020 1:51:24 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- R/I ok
|
MEC20-03067
| Pressure Test | 8/6/2020 | 8/6/2020 | 8/6/2020 1:50:56 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass tagged meter
|
MEC20-03322
| Final | 8/5/2020 | 8/6/2020 | 8/6/2020 12:23:06 PM | P | CANC |
|
|
Please contact Curtis Benton prior to arriving Phone #: ###-#### Inspection requested via web by Rick Borg- due to COVID 19 city of Boise has suspended inspections in occupied homes at this time and no date set to at this time- virtual video acceptable with contractor meeting with me onsite- talked with Kyle about this by phone said they will reschedule
|
MEC20-00302
| Card not on site to sign | 8/6/2020 | 8/6/2020 | 8/6/2020 12:02:01 PM | P | PASS |
|
|
no card onsite to sign
|
MEC20-00302
| Final | 8/6/2020 | 8/6/2020 | 8/6/2020 12:01:18 PM | P | PASS |
|
|
Final inspection Building 11 tower 3 - any questions contact Shawn @ ###-#### Phone #: ###-#### Inspection requested via web by Amanda Casper- Tower 3 all units ok
|
MEC20-02758
| Final | 8/5/2020 | 8/6/2020 | 8/6/2020 11:19:55 AM | A | FAIL |
|
|
ready for final. Emailing balance report to Brian scores. Phone #: ###-#### Inspection requested via web by Drew Tverdy- M0.0 hood equipment shows a 7 foot hood- need to install hood shown or revise drawings with hood installed and submit to city of Boise for review-
|
MEC20-01456
| Rough-in | 8/6/2020 | 8/6/2020 | 8/6/2020 10:18:40 AM | P | PASS |
|
|
ok with video/photo // Leslie Phone #: ###-####- R/i ok 2 bath fans and dryer duct- call in final when ready
|
MEC20-02832
| Final | 8/4/2020 | 8/6/2020 | 8/6/2020 9:50:07 AM | A | FAIL |
|
|
Call Maria in route to inspection -- ###-####--equipment in garage Phone #: ###-#### Inspection requested via web by Justin Osterhout- furnace a/c coil co ok- need locking caps on a/c service ports- send pic for reinspect
|
MEC20-03147
| Rough-in | 8/5/2020 | 8/6/2020 | 8/6/2020 9:17:44 AM | A | PART |
|
|
Linset inspection for cover Phone #: ###-#### Inspection requested via web by GREGORY ANDERSEN- pre rock 4th floor units 401 402 403 404 405 406 407 408 and 410 dryer in wall and linsets ok-
|
MEC20-02890
| Rough-in | 8/5/2020 | 8/6/2020 | 8/6/2020 8:50:33 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz
|
MEC20-02894
| Rough-in | 8/5/2020 | 8/6/2020 | 8/6/2020 8:50:23 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz
|
MEC20-02410
| Final | 7/31/2020 | 8/6/2020 | 8/6/2020 8:40:05 AM | A | PASS |
|
|
2468 Phone #: ###-#### Inspection requested via web by Randy Hart
|
MEC20-02411
| Final | 7/31/2020 | 8/6/2020 | 8/6/2020 8:39:55 AM | A | PASS |
|
|
2468 Phone #: ###-#### Inspection requested via web by Randy Hart
|
MEC20-03112
| Rough-in | 8/4/2020 | 8/6/2020 | 8/6/2020 8:22:36 AM | A | PART |
|
|
Please call Rich ###-#### Phone #: ###-#### Inspection requested via web by Beka Hereau- R/I on ducting and seal ok- ok for ceiling tiles- need to call in anoth R/I inspection when new fan coil installed- 1st floor exhaust will need to be inspected also
|
MEC19-04579
| Mec-Aging Inspection | 8/6/2020 | 8/6/2020 | 8/6/2020 7:47:45 AM | | FAIL |
|
|
contractor needs to schedule inspection if a/c has been set- extension granted on 5-7-20 to 11-7-20 permit will expire at this date or next aging if no activity
|
MIS20-00241
| MEC-Conference | 8/3/2020 | 8/6/2020 | 8/5/2020 1:19:55 PM | A | DONE |
|
|
check for permit- permit pulled under 6708 Fairview
|