Inspections for the day of: Thursday, August 6, 2020.
Number of inspections: 29
Percentage of inspections complete: 97 %
Percentage of inspections not complete: 3 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS20-00248 Set Bond Amount8/6/20208/6/20208/7/2020 9:00:14 AM DONE
$800 demo bond required for garage only//
BLD19-03701 BLD-Conference8/6/20208/6/20208/6/2020 4:10:44 PMPDONE
Zack-###-####- first thing
BLD20-01972 BLD-Foundation8/6/20208/6/20208/6/2020 4:10:07 PMPPART
Screened- stem wall inspection- Jeff Phone #: ###-####//rear setbacksare tight at 15'-measured from string line offset 5' from pins//will need to maintain 15' setback during construction//rebar per plans//WIP//
BLD20-01698 BLD-Foundation8/6/20208/6/20208/6/2020 4:08:17 PMPCANC
Screened- stem wall inspection- Jeff Phone #: ###-####//see previous inspection//
BLD20-00962 BLD-Final8/6/20208/6/20208/6/2020 3:55:19 PMPNR
Jeff - To determine requirements for TCO */Screened*/ Phone #: ###-####//need mechanical final//discussed requirements for accesible restroom, breakroom//accessible parking space needs to meet plans//existing accessible ramp--no new work on exterior//used a conference//
BLD19-04669 BLD-Final8/5/20208/6/20208/6/2020 2:28:55 PMAPASS
357
BLD19-04669 DOC - Permit Finaled8/6/20208/6/20208/6/2020 2:28:46 PMPPASS
BLD19-04669 BLD-Blower Door Test Results8/5/20208/6/20208/6/2020 2:27:01 PMADONE
3.3 ACH 50
BLD19-03050 BLD-Framing/Rough-in8/5/20208/6/20208/6/2020 1:59:10 PMPFAIL
Dave - */Screened*/ Phone #: ###-####//need to add nails to hangers//see truss docs for 2 ply girder nailing//CN posted//permit details show required plumbing and mechanical permits, they have not been issued or inspected//
BLD20-00399 BLD-Framing/Rough-in8/6/20208/6/20208/6/2020 1:22:21 PMPPART
Foam seal/ Framing Phone #: ###-#### Inspection requested via web by Shane Shade//still need anchor bolts installed//a couple other framing issues noted, see Russell for corrections//ok to insulate the rest of walls//
BLD20-00398 BLD-Framing/Rough-in8/6/20208/6/20208/6/2020 1:22:03 PMPPART
Foam seal/Framing Phone #: ###-#### Inspection requested via web by Shane Shade//still need anchor bolts installed//a couple other framing issues noted, see Russell for corrections//ok to insulate the rest of walls//
BLD20-00397 BLD-Framing/Rough-in8/6/20208/6/20208/6/2020 1:21:47 PMPPART
Foam seal/ Framing Phone #: ###-#### Inspection requested via web by Shane Shade//still need anchor bolts installed//a couple other framing issues noted, see Russell for corrections//ok to insulate the rest of walls//
BLD20-00357 BLD-Framing/Rough-in8/6/20208/6/20208/6/2020 1:21:31 PMPPART
Foam Seal/Framing Phone #: ###-#### Inspection requested via web by Shane Shade//still need anchor bolts installed//a couple other framing issues noted, see Russell for corrections//ok to insulate the rest of walls//
MIS19-00258 BLD-Final8/5/20208/6/20208/6/2020 12:20:38 PMPDONE
Phone #: ###-#### Inspection requested via web by Korry Holden
MIS19-00258 DOC - Permit Finaled8/6/20208/6/20208/6/2020 12:20:29 PMPPASS
BLD was final on 9/5/19//
BLD19-00538 BLD-Foundation8/5/20208/6/20208/6/2020 11:56:38 AMADEFR
Stem wall pour on garage 5. Pour time at 1pm Phone #: ###-#### Inspection requested via web by Travis Blackburn//defer to special inspections//was poured prior to my arrival//
BLD20-01952 BLD-Foundation8/5/20208/6/20208/6/2020 11:18:29 AMAPART
Secured access to site, requires escort. Please contact Justin Carbonaro, ###-####, atleast 30 minutes before arrival so he can meet you. Phone #: ###-#### Inspection requested via web by Scott Henderson//pending special inspection approval//maintain clearances, add standees for 9 total per the plan//
BLD19-03701 BLD-Conference8/6/20208/6/20208/6/2020 10:31:37 AMADONE
Zack-###-####- first thing
BLD20-01693 BLD-Framing/Rough-in8/5/20208/6/20208/6/2020 10:30:47 AMAPASS
Kevin *screened* Phone #: ###-####//engineering letter provided for front truss frame wall--ok per engineering and letter//ok to insulate//
BLD20-01926 BLD-Final8/5/20208/6/20208/6/2020 10:30:01 AMACANC
Phone #: ###-#### Inspection requested via web by David Dexter
BLD20-02385 BLD-Final8/5/20208/6/20208/6/2020 9:42:26 AMADONE
Inspection on a completed asphalt roofing project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD20-02385 DOC - Permit Finaled8/6/20208/6/20208/6/2020 9:42:13 AMPPASS
roof appears to be installed within code requirements//no access to back//
BLD20-02554 BLD-Final8/5/20208/6/20208/6/2020 9:35:25 AMADONE
Inspection on a completed asphalt roofing project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD20-02554 DOC - Permit Finaled8/6/20208/6/20208/6/2020 9:35:16 AMPPASS
roof appears to be installed within code requirements//no access to back//
BLD20-00962 BLD-Final8/5/20208/6/20208/6/2020 9:34:30 AMACANC
Jeff -*/Screened*/ Phone #: ###-####//needs mechanical finaled//need to have grid accessible for inspection//will need ACHD approval for final//
BLD20-02432 BLD-Final8/5/20208/6/20208/6/2020 9:03:12 AMADONE
Phone #: ###-#### Inspection requested via web by Edgar Sanchez
BLD20-02432 DOC - Permit Finaled8/6/20208/6/20208/6/2020 9:02:59 AMPPASS
roof appears to be installed within code requirements//no access to back//
BLD20-02313 BLD-Framing/Rough-in8/5/20208/6/20208/6/2020 8:38:20 AMADEFR
Taylor Barton - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting//no framing inspection required, the description states that no work is needed to strenghten the existing roof structure//a final inspection will need to be completed//
MIS18-00081 MIS-Aging Inspection8/6/20208/6/2020