MEC96-02207
| INSP - Conference | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | A | PASS |
|
|
discussed insulation around return ducts in attic
|
BLD96-01663
| INSP - Conference | 8/6/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | A | CANC |
|
|
CARPENTER WILL BE ON SITE. Postponed by owner. Numerous carpentry errors and have requested that we meet on site as frame was not ready ie needed other inspections on other visits
|
BLD96-01663
| INSP - Carpentry | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | A | NR |
|
|
still not on site, nor has carpentry been corrected
|
BLD96-01951
| INSP - Foundation | 8/6/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | A | PASS |
|
|
EARLY AM PLEASE
|
BLD96-01951
| INSP - Footings | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | A | PASS |
|
|
pier pads in interior of bldg
|
BLD95-00250
| INSP - Conference | 8/6/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | NR |
|
|
2 P.M. WED. plans not on site
|
BLD95-02164
| INSP - Conference | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PART |
|
|
discussed using 100 psf exit load on walkway at ras bldg
|
BLD95-02164
| INSP - Foundation | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PART |
|
|
wed. 2 p.m. appointment to pipe penetrations ok on East wall
|
BLD96-00070
| INSP - Framing/Rough-in | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | CANC |
|
|
done by Alan
|
BLD96-00250
| INSP - Siding | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PART |
|
|
siding is in contact with concrete
|
BLD96-00250
| INSP - Conference | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PASS |
|
|
discussed egress from window well and guardrail requirements around walking surface, drainage, etc
|
BLD96-00250
| INSP - Foundation | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PART |
|
|
checking old plans and contractors for compliance
|
BLD96-00250
| INSP - Footings | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PART |
|
|
checking plans and excavating as necessary for compliance
|
BLD96-00571
| INSP - Energy code compliance | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PASS |
|
|
|
BLD96-00571
| INSP - Framing/Rough-in | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PASS |
|
|
still working on gable wall
|
BLD96-00571
| INSP - Conference | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PASS |
|
|
met w/engineer and he is drawing up something for Kerr
|
BLD96-00609
| INSP - Final | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PASS |
|
|
|
BLD96-00609
| INSP - Letter of compliance | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PASS |
|
|
l/c issued
|
BLD96-00609
| INSP - Letter of compliance | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PASS |
|
|
l/c issued
|
BLD96-00762
| INSP - Final | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PASS |
|
|
|
BLD96-00762
| INSP - Letter of compliance | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PASS |
|
|
l/c issued
|
BLD96-00762
| INSP - Letter of compliance | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PASS |
|
|
l/c issued
|
BLD96-01306
| INSP - Foundation | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | PART |
|
|
garage/carport wall
|
BLD96-01640
| INSP - Framing/Rough-in | 8/7/1996 | 8/7/1996 | 8/7/1996 12:00:00 AM | P | NR |
|
|
not on map...will call plumb (Stan) for directions and do 8/8/96
|
MEC96-02207
| INSP - Gas pressure test | 8/6/1996 | 8/7/1996 | 8/6/1996 12:00:00 AM | A | PASS |
|
|
IT LOOKS LIKE YOU ALREADY PASSED R-IN, IF SO JUST NEEDS P/T
|