PLM00-02761
| Water and/or Sewer | 8/4/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | A | PASS |
|
|
Paige; ###-#### Sewer & water final 8/7/00 3:20:13 PM
|
PLM00-02766
| Water and/or Sewer | 8/4/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | A | PASS |
|
|
water line only ###-#### Water line final 8/7/00 3:21:07 PM
|
PLM00-02542
| Plumbing Rough-in | 8/4/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | A | FAIL |
|
|
Kevin; ###-####; Re-insp. Lock box with key. Lock box code 1290. Add nail plates- repipe 3" waste line 8/7/00 3:20:31 PM
|
PLM00-02773
| Plumbing Rough-in | 8/7/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | P | PASS |
|
|
###-#### rough in o 8/8/00 11:53:30 AM
|
PLM00-02753
| Plumbing Rough-in | 8/7/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | P | PASS |
|
|
sean ###-#### ground work ok 8/8/00 11:54:27 AM
|
PLM00-02777
| Sprinkler (Final) | 8/7/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | P | FAIL |
|
|
###-#### replace 100 psi pipe w/160 psi pipe 8/8/00 11:53:20 AM
|
PLM00-02066
| Plumbing Rough-in | 8/7/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | P | PASS |
|
|
###-#### rough in ok 8/8/00 11:54:35 AM
|
PLM00-02778
| Water and/or Sewer | 8/7/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | P | PASS |
|
|
ron ###-#### water line only outside water line final 8/8/00 11:54:09 AM
|
PLM00-02779
| Final | 8/7/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | P | PASS |
|
|
sewer only\\###-#### outside sewer turn around final 8/8/00 11:53:58 AM
|
PLM00-02726
| Water and/or Sewer | 8/7/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/07/2000 at 10:54:40. Contact: ###-####. outside sewer turn around final 8/8/00 11:53:45 AM
|
PLM00-01723
| Final | 8/7/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/07/2000 at 10:56:48. Contact: ###-####. final ok 8/8/00 11:54:16 AM
|