PLM00-01255
| Final | 8/4/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/04/2000 at 11:54:30. Contact: ###-####.
|
PLM00-02669
| Sprinkler (Final) | 8/4/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | A | FAIL |
|
|
Enrique-###-#### no corrections made still look to have 80 psi pipe upstream of th 8/7/2000 8:52:53 AM e pvb and the pvb 8/7/2000 8:53:03 AMisn't testes. 8/7/2000 8:53:29 AM
|
PLM00-02772
| Plumbing Rough-in | 8/7/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM00-02745
| Groundwork | 8/7/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM00-01780
| Final | 8/7/2000 | 8/7/2000 | 8/7/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/07/2000 at 09:48:27. Contact: ###-####. spent 20 min. tryin ta get in no luck 8/7/2000 2:40:57 PM hey I finallygot in , final ok plumber to repermit mop sink in utility room and lav in downstairs 1/2 bath 8/7/2000 2:58:32 PM
|