Inspections for the day of: Monday, August 7, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00479 BLD-Final8/4/20008/7/20008/7/2000 12:00:00 AMAPASS
###-####; card to cont. 8/7/2000 11:20:03 AM
BLD99-03170 BLD-Conference8/4/20008/7/20008/7/2000 12:00:00 AMAPASS
Jerry ###-####
BLD00-01084 BLD-Conference8/4/20008/7/20008/7/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/07/2000 at 10:04:20. re tunnel lid at corridors 8/7/2000 1:58:22 PM
BLD00-00478 BLD-Other8/4/20008/7/20008/7/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/04/2000 at 15:27:18. Contact: ###-####.grid at rear switch rm ok pend hvac 8/7/2000 11:24:05 AM 8/7/2000 11:25:12 AM
BLD98-01756 BLD-Final8/4/20008/7/20008/7/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/04/2000 at 16:39:05. Contact: ###-####.
BLD99-03067 BLD-Conference8/7/20008/7/20008/7/2000 12:00:00 AMAPASS
Added by Inspector: 340 On 8/7/2000 w/ Bill Davis re eng'g
BLD00-01861 BLD-Framing/Rough-in8/7/20008/7/20008/7/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/07/2000 at 09:06:20. Contact: ###-####.int corridor framing ok to cover, chk firestops, etc at next insp. Tunnel corridor. 8/7/2000 12:15:39 PM
BLD99-02146 BLD-Framing/Rough-in8/7/20008/7/20008/7/2000 12:00:00 AMPPART
shear nailing\\###-####; part, ext nailing ok; add hd's missed & int osb 8/7/2000 3:42:18 PM
BLD00-00080 BLD-Final8/7/20008/7/20008/7/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/07/2000 at 10:04:20. Contact: ###-####.
MIS00-00184 BLD-Final8/7/20008/7/20008/7/2000 12:00:00 AMPFAIL
please call first ###-#### susan or wayne; not complete 8/7/2000 11:47:47 AM