PLM01-01409
| PLM-Aging Inspection | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | | PASS |
|
|
|
PLM01-01969
| Sprinkler (Final) | 8/6/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | A | PASS |
|
|
###-####- CAROL BACKFLOW office sent out the wrong permit somehow, 8/7/2001 8:58:04 AM
|
PLM01-01737
| Final | 8/6/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | A | PASS |
|
|
FN INSP- BOB -###-####
|
PLM01-00342
| Water and/or Sewer | 8/6/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | A | PART |
|
|
WATER R/I - ###-#### -RM MECH scullery water test ok 8/7/2001 9:38:12 AM
|
PLM01-02645
| Groundwork | 8/6/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | A | PASS |
|
|
###-#### early am want to pour
|
PLM01-02571
| Water and/or Sewer | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | PART |
|
|
SWR LINE-- TIM- ###-#### sewer ok needs to reset the pump chamber, no water line yet. 8/7/2001 2:04:02 PM
|
PLM01-02040
| Plumbing Rough-in | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 08:46:00. Contact: ###-####. water heater piping and washer trap in exterior wall, R-13 required behind washer trap prior to reinspection, PEX within 12" of recessed light fixture, nail plates required where piping is within 1" of face of stud or plate. 8/7/2001 3:04:18 PM
|
PLM01-02041
| Plumbing Rough-in | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 08:46:47. Contact: ###-####. water heater piping and washer trap in outside wall, R-13 required behind washer trap prior to reinspection, PEX wih in 12" of recessed light fixture, nail plates required where piping is within 1" of face of stud or plate. 8/7/2001 3:02:13 PM
|