Inspections for the day of: Tuesday, August 7, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-01409 PLM-Aging Inspection8/7/20018/7/20018/7/2001 12:00:00 AM PASS
PLM01-01969 Sprinkler (Final)8/6/20018/7/20018/7/2001 12:00:00 AMAPASS
###-####- CAROL BACKFLOW office sent out the wrong permit somehow, 8/7/2001 8:58:04 AM
PLM01-01737 Final8/6/20018/7/20018/7/2001 12:00:00 AMAPASS
FN INSP- BOB -###-####
PLM01-00342 Water and/or Sewer8/6/20018/7/20018/7/2001 12:00:00 AMAPART
WATER R/I - ###-#### -RM MECH scullery water test ok 8/7/2001 9:38:12 AM
PLM01-02645 Groundwork8/6/20018/7/20018/7/2001 12:00:00 AMAPASS
###-#### early am want to pour
PLM01-02571 Water and/or Sewer8/7/20018/7/20018/7/2001 12:00:00 AMPPART
SWR LINE-- TIM- ###-#### sewer ok needs to reset the pump chamber, no water line yet. 8/7/2001 2:04:02 PM
PLM01-02040 Plumbing Rough-in8/7/20018/7/20018/7/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/07/2001 at 08:46:00. Contact: ###-####. water heater piping and washer trap in exterior wall, R-13 required behind washer trap prior to reinspection, PEX within 12" of recessed light fixture, nail plates required where piping is within 1" of face of stud or plate. 8/7/2001 3:04:18 PM
PLM01-02041 Plumbing Rough-in8/7/20018/7/20018/7/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/07/2001 at 08:46:47. Contact: ###-####. water heater piping and washer trap in outside wall, R-13 required behind washer trap prior to reinspection, PEX wih in 12" of recessed light fixture, nail plates required where piping is within 1" of face of stud or plate. 8/7/2001 3:02:13 PM