FIR01-00103
| INSP-Final Inspection | 8/6/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | A | PASS |
|
|
OK on hydro test of FDC piping 8/7/2001 4:52:02 PM
|
FIR01-00138
| INSP-Sprinkler Rough-in/Hydro | 8/6/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | CANC |
|
|
Cancel wrong permit 8/7/2001 3:06:29 PM
|
FIR01-00319
| INSP-Supply line flush | 8/6/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | PASS |
|
|
OK on supply line flush and Ok on underground hydro test 8/7/2001 4:33:16 PM
|
FIR01-00418
| INSP-Sprinkler Rough-in/Hydro | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | PART |
|
|
OK to cover supply line FDC piping yet to be completed 8/7/2001 3:52:27 PM
|
BLD00-03539
| FIRE-Final Inspection | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | PASS |
|
|
Final OK for certificate of completion 8/7/2001 4:33:51 PM
|
FIR00-00430
| INSP-Sprinkler Rough-in/Hydro | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | PART |
|
|
OK on rough in of 3rd flr and Ok on above ground hydro test except FDC connection 8/7/2001 3:07:23 PM
|