Inspections for the day of: Tuesday, August 7, 2001.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01213 BLD-Aging Inspection8/7/20018/7/20018/7/2001 12:00:00 AM PASS
wip 8/7/2001 8:32:30 AM
BLD01-01211 BLD-Aging Inspection8/7/20018/7/20018/7/2001 12:00:00 AM PASS
wip 8/7/2001 8:32:39 AM
BLD01-01200 BLD-Aging Inspection8/7/20018/7/20018/7/2001 12:00:00 AM PASS
wip 8/7/2001 8:32:34 AM
BLD01-02054 BLD-Footing8/6/20018/7/20018/7/2001 12:00:00 AMAPART
wip, verbal corrections 8/7/2001 12:05:33 PM
BLD01-01390 BLD-Framing/Rough-in8/6/20018/7/20018/7/2001 12:00:00 AMAPART
###-####
c/n posted, ok to insulate 8/7/2001 12:05:07 PM
MEC01-02029 Final8/6/20018/7/20018/7/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 08/06/2001 at 15:22:07. Contact: ###-####.
BLD01-00533 BLD-Final8/6/20018/7/20018/7/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 08/06/2001 at 10:10:20. Contact: .
MEC01-01289 Pressure Test8/6/20018/7/20018/7/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 08/06/2001 at 12:17:38. Contact: ###-####.
BLD01-01056 BLD-Foundation8/6/20018/7/20018/7/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/06/2001 at 16:32:29. Contact: ###-####.wip, need letter from eng. on vert. lap and bar placement in wall 8/7/2001 12:04:40 PM
BLD01-01275 BLD-Framing/Rough-in8/6/20018/7/20018/7/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 08/06/2001 at 12:52:41. Contact: ###-####.
BLD01-01806 BLD-Energy code compliance8/6/20018/7/20018/7/2001 12:00:00 AMPPART
###-####
verify rest of prior c/n at final, some insulating to do in existing house, ok to cover when ready 8/7/2001 2:10:02 PM
BLD01-00625 BLD-Final8/7/20018/7/20018/7/2001 12:00:00 AMPPASS
FN TODD-###-####
BLD01-00626 BLD-Final8/7/20018/7/20018/7/2001 12:00:00 AMPPASS
TODD- ###-#### FN
BLD01-01728 BLD-Framing/Rough-in8/7/20018/7/20018/7/2001 12:00:00 AMPFAIL
SHEAR NAIL TODD ###-####
c/n posted 8/7/2001 3:34:32 PM
BLD01-01726 BLD-Framing/Rough-in8/7/20018/7/20018/7/2001 12:00:00 AMPFAIL
SHEAR NAIL TODD ###-####
c/n posted 8/7/2001 3:34:19 PM
MIS01-00139 BLD-Conference8/7/20018/7/20018/7/2001 12:00:00 AMPPASS
Place SWO on this project. Permits required for door/window installation, portico framing and roof drains.325.
placed swo on gate, said to call plan review to obtain permits, gave 415 and 325 phone #s, double fee should be imposed. 8/7/2001 1:59:00 PM
BLD01-01056 BLD-Foundation8/7/20018/7/20018/7/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/07/2001 at 10:42:48. Contact: ###-####.recvd letter from eng., wip, ok to pour after fixes 8/7/2001 3:36:40 PM