BLD01-01213
| BLD-Aging Inspection | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | | PASS |
|
|
wip 8/7/2001 8:32:30 AM
|
BLD01-01211
| BLD-Aging Inspection | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | | PASS |
|
|
wip 8/7/2001 8:32:39 AM
|
BLD01-01200
| BLD-Aging Inspection | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | | PASS |
|
|
wip 8/7/2001 8:32:34 AM
|
BLD01-02054
| BLD-Footing | 8/6/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | A | PART |
|
|
wip, verbal corrections 8/7/2001 12:05:33 PM
|
BLD01-01390
| BLD-Framing/Rough-in | 8/6/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | A | PART |
|
|
###-####
c/n posted, ok to insulate 8/7/2001 12:05:07 PM
|
MEC01-02029
| Final | 8/6/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 15:22:07. Contact: ###-####.
|
BLD01-00533
| BLD-Final | 8/6/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 10:10:20. Contact: .
|
MEC01-01289
| Pressure Test | 8/6/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 12:17:38. Contact: ###-####.
|
BLD01-01056
| BLD-Foundation | 8/6/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 16:32:29. Contact: ###-####.wip, need letter from eng. on vert. lap and bar placement in wall 8/7/2001 12:04:40 PM
|
BLD01-01275
| BLD-Framing/Rough-in | 8/6/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 12:52:41. Contact: ###-####.
|
BLD01-01806
| BLD-Energy code compliance | 8/6/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | PART |
|
|
###-####
verify rest of prior c/n at final, some insulating to do in existing house, ok to cover when ready 8/7/2001 2:10:02 PM
|
BLD01-00625
| BLD-Final | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | PASS |
|
|
FN TODD-###-####
|
BLD01-00626
| BLD-Final | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | PASS |
|
|
TODD- ###-#### FN
|
BLD01-01728
| BLD-Framing/Rough-in | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | FAIL |
|
|
SHEAR NAIL TODD ###-####
c/n posted 8/7/2001 3:34:32 PM
|
BLD01-01726
| BLD-Framing/Rough-in | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | FAIL |
|
|
SHEAR NAIL TODD ###-####
c/n posted 8/7/2001 3:34:19 PM
|
MIS01-00139
| BLD-Conference | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | PASS |
|
|
Place SWO on this project. Permits required for door/window installation, portico framing and roof drains.325.
placed swo on gate, said to call plan review to obtain permits, gave 415 and 325 phone #s, double fee should be imposed. 8/7/2001 1:59:00 PM
|
BLD01-01056
| BLD-Foundation | 8/7/2001 | 8/7/2001 | 8/7/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 10:42:48. Contact: ###-####.recvd letter from eng., wip, ok to pour after fixes 8/7/2001 3:36:40 PM
|