BLD02-00313
| BLD-Aging Inspection | 8/7/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | | DONE |
|
|
demo w/ add'l structure (lintel) added at existing wall 8/7/2003 8:33:04 AM
|
BLD02-00345
| BLD-Aging Inspection | 8/7/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | | PASS |
|
|
Wip...sloooww... 8/7/2003 8:31:00 AM
|
BLD02-00348
| BLD-Aging Inspection | 8/7/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | | DONE |
|
|
work appears ok 8/7/2003 8:33:56 AM
|
BLD02-02815
| BLD-Final | 8/7/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 7:07:15 AM. Contact: ###-####.
|
BLD03-00435
| BLD-Framing/Rough-in | 8/6/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 8/6/2003 at 2:15:43 PM. Contact: ###-####.
|
BLD02-00370
| BLD-Framing/Rough-in | 8/6/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 8/6/2003 at 2:53:22 PM.
|
BLD02-00090
| BLD-Other | 8/6/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | A | NR |
|
|
expansion joint
|
BLD03-01417
| BLD-Framing/Rough-in | 8/6/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | P | NH |
|
|
|
BLD02-00370
| BLD-Conference | 8/6/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | P | PASS |
|
|
|
BLD02-00199
| BLD-Foundation | 8/4/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | P | PART |
|
|
###-#### mike pend special insp reports 8/7/2003 4:16:52 PM
|
BLD03-01163
| BLD-Framing/Rough-in | 8/7/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 7:57:06 AM. Contact: ###-####.
|
BLD03-00315
| BLD-Final | 8/7/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 8:04:12 AM. Contact: ###-####....ok for l/c 8/7/2003 3:48:14 PM
|
BLD03-01240
| BLD-Energy code compliance | 8/7/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | P | PART |
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung...walls ok 8/7/2003 4:16:29 PM
|
BLD03-00435
| BLD-Framing/Rough-in | 8/7/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | P | NR |
|
|
need elec 1st 8/7/2003 3:11:47 PM
|
BLD03-00435
| BLD-Framing/Rough-in | 8/7/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | P | NR |
|
|
|
BLD02-00370
| BLD-Framing/Rough-in | 8/7/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | P | PART |
|
|
verifying hd's...wip 8/7/2003 5:05:53 PM
|
BLD02-02815
| BLD-Conference | 8/7/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | P | PASS |
|
|
need partial final for use of triage area, ok 8/7/2003 4:21:32 PM
|
BLD03-01240
| BLD-Framing/Rough-in | 8/7/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | P | PART |
|
|
ok, except support fnd blocks at existing wall at bottom of stairs w/ lintel or equal (reinforced jamb?)
|
BLD02-02815
| BLD-Final | 8/7/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | P | PART |
|
|
This phase ok for use, walls patched/ firestopped ok 8/7/2003 5:08:55 PM
|
BLD03-01163
| BLD-Energy code compliance | 8/7/2003 | 8/7/2003 | 8/7/2003 12:00:00 AM | P | PART |
|
|
walls ok
|