ELE07-02750
| Rough-In Permanent Service | 8/7/2007 | 8/7/2007 | 8/7/2007 3:14:52 PM | P | PART |
|
|
DAVE - HE WILL MEET @ JOBSITE Phone #: ###-#### Internet Inspection Request from: Randy Vail No R/I P/S O/H R Ok to transfer power. check sub panels on final
|
ELE07-02092
| Electrical Rough-In | 8/7/2007 | 8/7/2007 | 8/7/2007 2:49:02 PM | P | PART |
|
|
larren - 1st floor entry Phone #: ###-#### 1st floor entry ok
|
ELE07-02759
| Permanent Service | 8/7/2007 | 8/7/2007 | 8/7/2007 2:17:59 PM | P | NR |
|
|
bobby Phone #: ###-#### had conf. requires main outside isolate neutral in sub panel ground to water within 5 ft of where it enters the building id existing neutral white with tape
|
ELE07-02749
| Rough-In Permanent Service | 8/7/2007 | 8/7/2007 | 8/7/2007 1:19:08 PM | P | PART |
|
|
DAVE - HE WILL MEET @ JOBSITE Phone #: ###-#### Internet Inspection Request from: Randy Vail No R/I P/S O/H R Ok to transfer power. check sub panels on final
|
ELE07-02748
| Rough-In Permanent Service | 8/7/2007 | 8/7/2007 | 8/7/2007 1:06:06 PM | P | PART |
|
|
DAVE - HE WILL MEET @ JOBSITE Phone #: ###-#### Internet Inspection Request from: Randy Vail No R/I P/S O/H R Ok to transfer power. check sup panels on final.
|
ELE07-00164
| Final | 8/6/2007 | 8/7/2007 | 8/7/2007 11:50:22 AM | A | PASS |
|
|
Mark; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
ELE07-02647
| Permanent Service | 8/6/2007 | 8/7/2007 | 8/7/2007 10:45:40 AM | A | PASS |
|
|
rick Phone #: ###-#### P/S o/h n ok
|
ELE06-02323
| Electrical Rough-In | 8/6/2007 | 8/7/2007 | 8/7/2007 9:55:47 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/6/2007 at 2:54:09 PM. Contact: ###-####. north parking garage ceiling anop
|
ELE07-02044
| Conference | 8/6/2007 | 8/7/2007 | 8/7/2007 9:12:41 AM | A | PART |
|
|
Skip; Phone #: ###-#### Internet Inspection Request from: Darla Downs had conf about services grounding and grouping. at this time the 3 disconnects for the 3 phase service are grouped. the single phase services will be labeled now, and they shall be grouped as new tennents are cycled into spaces.
|
ELE07-02044
| Permanent Service | 8/7/2007 | 8/7/2007 | 8/7/2007 9:02:49 AM | P | PASS |
|
|
Skip; Phone #: ###-#### Internet Inspection Request from: Darla Downs check for all grounds tied together and labeling on disconnects on next inspection.
P/S U/G R Ok to transfer power.
|