BLD07-01201
| FIRE-Final Inspection | 8/7/2007 | 8/7/2007 | 8/8/2007 9:10:10 AM | P | PART |
|
|
The new insulation backing has been installed in tenant spaces 10448, 10374 and 10366 and appears ok.
|
BLD07-00054
| FIRE-Final Inspection | 8/7/2007 | 8/7/2007 | 8/7/2007 4:10:24 PM | P | PASS |
|
|
life safety passed
|
FIR07-00497
| INSP-Sprinkler Rough-in/Hydro | 8/6/2007 | 8/7/2007 | 8/7/2007 4:09:24 PM | A | PASS |
|
|
Hydro tests for the anti-freeze system and the overhead system passed.
|
BLD07-00055
| FIRE-Final Inspection | 8/6/2007 | 8/7/2007 | 8/7/2007 3:13:09 PM | P | PASS |
|
|
life safety passed.
|
FIR07-00459
| INSP-Sprinkler Rough-in | 8/7/2007 | 8/7/2007 | 8/7/2007 3:10:56 PM | P | PASS |
|
|
The remaining underground supply piping is ok to cover.
|
FIR07-00530
| INSP-Sprinkler Rough-in | 8/6/2007 | 8/7/2007 | 8/7/2007 1:51:13 PM | A | FAIL |
|
|
The tenting isn't satifactory and one piece of piping as marked on the plans has been installed as 1" wereas the plans indicate 1 1/4" is to be installed. The riser is too far off of the wall as well and is not completely built yet.
|
BLD07-02047
| FIRE-Final Inspection | 8/7/2007 | 8/7/2007 | 8/7/2007 1:43:38 PM | P | FAIL |
|
|
Provide the building address near the entrance as discussed, remove the locking hardware from the exit door from the restroom into this tenant space, provide lever hardware on all of the office doors as discussed, provide passage hardware on the door to the north exit corridor, repair all exit signs and emergency lights.
|