Inspections for the day of: Thursday, August 7, 2008.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE08-00459 Electrical Rough-In8/7/20088/7/20088/7/2008 4:20:41 PMPPASS
Scheduled by a contractor via Hello! on 8/7/2008 at 8:28:53 AM. Contact: ###-####. hard lids for halls and baths ok to cover
ESC08-00191 General Inspection8/7/20088/7/20088/7/2008 3:47:37 PMPPART
looked ok
ESC07-01261 General Inspection8/7/20088/7/20088/7/2008 3:46:56 PMPPART
looked ok
ESC07-01259 General Inspection8/7/20088/7/20088/7/2008 3:46:09 PMPPART
looked ok
ESC07-01208 General Inspection8/7/20088/7/20088/7/2008 3:45:18 PMPPART
looked ok
ESC08-00116 General Inspection8/7/20088/7/20088/7/2008 3:44:26 PMAPART
looked ok
ESC08-00357 General Inspection8/7/20088/7/20088/7/2008 3:43:29 PMAPART
looked ok
ESC08-00490 General Inspection8/7/20088/7/20088/7/2008 3:42:33 PMAPART
looked ok
ELE08-02213 Electrical Rough-In8/7/20088/7/20088/7/2008 3:40:58 PMPPASS
Ron- call 30 min prior to going Phone #: ###-#### ric ok, no esc this project
ELE08-01508 Final8/7/20088/7/20088/7/2008 3:06:33 PMPPART
Bob requested maybe to have a final inspection in parts. This is for half or all first floor. Thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig looked at 1st floor only, left correction notice,NEC605.7 shall provide means to simultaneously disconnect all ungrounded conductors for furniture, 110.3(B) listed equipment shall be installed per instructions included in listing (furniture), no esc this project
ELE08-01350 Final8/7/20088/7/20088/7/2008 1:37:40 PMPPASS
Pat Phone #: ###-#### ok to final
ELE08-00796 Final8/7/20088/7/20088/7/2008 1:00:10 PMPPASS
Pat Phone #: ###-#### ok to final
ELE08-01064 Electrical Rough-In8/7/20088/7/20088/7/2008 12:21:33 PMPPASS
neil - floor heat inspection Phone #: ###-#### ok to cover floor heat, 2 baths
ELE08-02001 Final8/7/20088/7/20088/7/2008 10:14:12 AMAPASS
READY FOR INSPECTION.

THANKS JACK... BOB Phone #: ###-#### Internet Inspection Request from: Bob Glenn ok to final
ELE08-01962 Permanent Service8/6/20088/7/20088/7/2008 9:47:57 AMAPASS
We completed the power connection to the power pedestal. Phone #: ###-#### Internet Inspection Request from: Clint Tate p/s u/g n ok, no esc this project
ELE08-02208 Electrical Rough-In8/6/20088/7/20088/7/2008 9:27:16 AMAPASS
Dale Phone #: ###-#### ok to cover u/g for site lighting only- south box then west side of lot to north box
ELE08-01078 Electrical Rough-In8/6/20088/7/20088/7/2008 9:22:58 AMACANC
Shallan Phone #: ###-#### see conference
ELE08-01078 Conference8/7/20088/7/20088/7/2008 9:10:28 AMADONE
Shallan Phone #: ###-#### not ready for ri, conductors require stapling, boxes mounted, make-up, flush out boxes, 6" free conductor, talked about service and grounding and sub-panel and junction boxes, too many conductors thru hole to be fire stopped
ELE08-02143 Final8/7/20088/7/20088/7/2008 9:06:27 AMPCANC
Panel TPA Phone #: ###-#### Internet Inspection Request from: Don Lustig Inspection cancelled from web by: Don Lustig
ELE08-02169 Final8/6/20088/7/20088/7/2008 8:04:07 AMAPASS
DAVE OWEN Phone #: ###-#### Internet Inspection Request from: Randy Vail ok to final, no esc this project
ELE08-02169 Permanent Service8/7/20088/7/20088/7/2008 8:03:58 AMAPASS
DAVE OWEN Phone #: ###-#### Internet Inspection Request from: Randy Vail p/s u/g n ok, no esc this project