Inspections for the day of: Thursday, August 7, 2008.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorWilliam E Thomas
TitleELE-INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE08-02212 Temporary Service8/7/20088/7/20088/7/2008 4:22:29 PMPNR
Contact is Perry. Phone #: ###-#### Internet Inspection Request from: David Bonner
. .1. tp is not put together, just a pile of parts. . .
ELE08-02172 Electrical Rough-In8/6/20088/7/20088/7/2008 3:34:32 PMPPART
Lyubov ###-####
. .1. ri ok. . .
. .2. panel work not done, need to look at panel makeup at final. . .
ELE08-01206 Electrical Rough-In8/7/20088/7/20088/7/2008 2:07:17 PMPPART
upstairs, need ok to cover Phone #: ###-#### Internet Inspection Request from: Randy Fletcher
. .1. upstairs only ok to cover. . .
ELE08-02215 Permanent Service8/7/20088/7/20088/7/2008 1:45:34 PMPPASS
John Phone #: ###-####
. .1. p/s u/g new/reconnect ok. . .
. .2. no ri/cover at this time for the interior. . .
ELE08-02035 Final8/7/20088/7/20088/7/2008 12:22:50 PMPPASS
Tom Phone #: ###-####
. .1. final ok. . .
ELE08-02214 Electrical Rough-In8/7/20088/7/20088/7/2008 12:03:11 PMPPASS
Jay- call for access Phone #: ###-####
. .1. ri ok walls and cielling. . .
ELE08-02184 Electrical Rough-In8/6/20088/7/20088/7/2008 11:34:39 AMAPASS
Scheduled by a contractor via Hello! on 8/6/2008 at 3:43:51 PM. Contact: ###-####.
. .1. ok to cover with concrete. . .
ELE08-02193 Temporary Service8/6/20088/7/20088/7/2008 10:54:05 AMAFAIL
Charlie Phone #: ###-#### Internet Inspection Request from: Charles Davis
. .1. the post that supports the service must be mounted into a hole for inspection. . .
ESC07-01254 General Inspection8/7/20088/7/20088/7/2008 10:51:22 AMAPASS
. .1. the site is completly clean, along with the gutters. . .
ELE08-02054 Electrical Rough-In8/6/20088/7/20088/7/2008 10:07:38 AMAFAIL
UG cover inspection Phone #: ###-#### Internet Inspection Request from: Jari Rivers
. .1. conduit damaged, and should have been fixed. this is within the first 20ft of the run from the house service. . .
. .2. other areas are ok for cover. . .
. .3. must leave open the first 20ft of the run from the house service. . .
ELE08-01618 Electrical Rough-In8/6/20088/7/20088/7/2008 9:40:48 AMAFAIL
Ceiling Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton
. .1. mc cable not properly supported and secured on 1st flr cielling. . .
. .2. cables and raceways shall not be secured by the cielling assembly. . .
ELE08-01461 Electrical Rough-In8/6/20088/7/20088/7/2008 9:38:53 AMANR
Ceiling Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton
. .1. not ready. .
ELE07-02302 Final8/7/20088/7/20088/7/2008 6:57:55 AMPPART
. .1. The following listed items are outstanding, the general area views are shown on drawing A2.03 & A2.04 . . .
. .2. 1st and 2nd floor A2.03 & A2.04-- everything in area *A* has not been inspected for final inspection, the boundries are -- east of phase line *8* and north of phase line *L*. . .
. .3. The contractor says that they are going to get a T/O without area *A*, that complete area is still under full construction. . .
. .4. 1st flr items are as follows: a. vestubile- missing switches, b. gym- missing switches, c. elevator pit (by the locker rooms)-- gfci recep, d. caferteria- floor receps east of phase line *11*, e. panel schedules in all electrical rooms, f. all exterior site lighting, g. athletic storage rooms K01 & K02-- missing receps and switches. . .
. .5. 2nd flr items are as follows-- a. auxiliary gym-- receps, b. wrestling room-- receps, c. weight room-- receps, d. items a thru c are due to no breakers in the panel (back order), e. library-- south wall missing receps (waiting on cabinets to be installed), f. electrical rooms-- missing panel schedules. . .