ELE08-02212
| Temporary Service | 8/7/2008 | 8/7/2008 | 8/7/2008 4:22:29 PM | P | NR |
|
|
Contact is Perry. Phone #: ###-#### Internet Inspection Request from: David Bonner . .1. tp is not put together, just a pile of parts. . .
|
ELE08-02172
| Electrical Rough-In | 8/6/2008 | 8/7/2008 | 8/7/2008 3:34:32 PM | P | PART |
|
|
Lyubov ###-#### . .1. ri ok. . . . .2. panel work not done, need to look at panel makeup at final. . .
|
ELE08-01206
| Electrical Rough-In | 8/7/2008 | 8/7/2008 | 8/7/2008 2:07:17 PM | P | PART |
|
|
upstairs, need ok to cover Phone #: ###-#### Internet Inspection Request from: Randy Fletcher . .1. upstairs only ok to cover. . .
|
ELE08-02215
| Permanent Service | 8/7/2008 | 8/7/2008 | 8/7/2008 1:45:34 PM | P | PASS |
|
|
John Phone #: ###-#### . .1. p/s u/g new/reconnect ok. . . . .2. no ri/cover at this time for the interior. . .
|
ELE08-02035
| Final | 8/7/2008 | 8/7/2008 | 8/7/2008 12:22:50 PM | P | PASS |
|
|
Tom Phone #: ###-#### . .1. final ok. . .
|
ELE08-02214
| Electrical Rough-In | 8/7/2008 | 8/7/2008 | 8/7/2008 12:03:11 PM | P | PASS |
|
|
Jay- call for access Phone #: ###-#### . .1. ri ok walls and cielling. . .
|
ELE08-02184
| Electrical Rough-In | 8/6/2008 | 8/7/2008 | 8/7/2008 11:34:39 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/6/2008 at 3:43:51 PM. Contact: ###-####. . .1. ok to cover with concrete. . .
|
ELE08-02193
| Temporary Service | 8/6/2008 | 8/7/2008 | 8/7/2008 10:54:05 AM | A | FAIL |
|
|
Charlie Phone #: ###-#### Internet Inspection Request from: Charles Davis . .1. the post that supports the service must be mounted into a hole for inspection. . .
|
ESC07-01254
| General Inspection | 8/7/2008 | 8/7/2008 | 8/7/2008 10:51:22 AM | A | PASS |
|
|
. .1. the site is completly clean, along with the gutters. . .
|
ELE08-02054
| Electrical Rough-In | 8/6/2008 | 8/7/2008 | 8/7/2008 10:07:38 AM | A | FAIL |
|
|
UG cover inspection Phone #: ###-#### Internet Inspection Request from: Jari Rivers . .1. conduit damaged, and should have been fixed. this is within the first 20ft of the run from the house service. . . . .2. other areas are ok for cover. . . . .3. must leave open the first 20ft of the run from the house service. . .
|
ELE08-01618
| Electrical Rough-In | 8/6/2008 | 8/7/2008 | 8/7/2008 9:40:48 AM | A | FAIL |
|
|
Ceiling Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton . .1. mc cable not properly supported and secured on 1st flr cielling. . . . .2. cables and raceways shall not be secured by the cielling assembly. . .
|
ELE08-01461
| Electrical Rough-In | 8/6/2008 | 8/7/2008 | 8/7/2008 9:38:53 AM | A | NR |
|
|
Ceiling Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton . .1. not ready. .
|
ELE07-02302
| Final | 8/7/2008 | 8/7/2008 | 8/7/2008 6:57:55 AM | P | PART |
|
|
. .1. The following listed items are outstanding, the general area views are shown on drawing A2.03 & A2.04 . . . . .2. 1st and 2nd floor A2.03 & A2.04-- everything in area *A* has not been inspected for final inspection, the boundries are -- east of phase line *8* and north of phase line *L*. . . . .3. The contractor says that they are going to get a T/O without area *A*, that complete area is still under full construction. . . . .4. 1st flr items are as follows: a. vestubile- missing switches, b. gym- missing switches, c. elevator pit (by the locker rooms)-- gfci recep, d. caferteria- floor receps east of phase line *11*, e. panel schedules in all electrical rooms, f. all exterior site lighting, g. athletic storage rooms K01 & K02-- missing receps and switches. . . . .5. 2nd flr items are as follows-- a. auxiliary gym-- receps, b. wrestling room-- receps, c. weight room-- receps, d. items a thru c are due to no breakers in the panel (back order), e. library-- south wall missing receps (waiting on cabinets to be installed), f. electrical rooms-- missing panel schedules. . .
|