BLD09-01256
| BLD-Energy code compliance | 8/7/2009 | 8/7/2009 | 8/7/2009 4:47:27 PM | P | PASS |
|
|
Steve Phone #: ###-####
|
ESC07-01385
| Random Inspection | 8/7/2009 | 8/7/2009 | 8/7/2009 3:41:14 PM | P | PART |
|
|
clean up daily
|
BLD09-01284
| BLD-Footing | 8/6/2009 | 8/7/2009 | 8/7/2009 3:07:12 PM | P | PART |
|
|
mana Phone #: ###-#### was dug 8" deeper,, wip
|
ESC09-00486
| Site Preparation | 8/7/2009 | 8/7/2009 | 8/7/2009 2:29:17 PM | P | PART |
|
|
wip on bmp's
|
BLD07-01686
| BLD-Final | 8/6/2009 | 8/7/2009 | 8/7/2009 1:03:36 PM | A | NR |
|
|
Please call at least a half hour prior to inspection Phone #: ###-#### needs Zoning prior to my final, no inspection made,, phone conf only
|
BLD08-01462
| BLD-Final | 8/6/2009 | 8/7/2009 | 8/7/2009 1:00:30 PM | A | CANC |
|
|
Don- call 30 mins prior to going Phone #: ###-#### canc till Monday
|
BLD08-01548
| BLD-Framing/Rough-in | 8/6/2009 | 8/7/2009 | 8/7/2009 12:59:54 PM | A | PASS |
|
|
hawk Phone #: ###-####
|
BLD07-02859
| BLD-Framing/Rough-in | 8/6/2009 | 8/7/2009 | 8/7/2009 11:57:57 AM | A | PART |
|
|
tracy Phone #: ###-#### exterior wall on main floor ok to insulate,, need mech r/in prior to rock
|
BLD09-01256
| BLD-Energy code compliance | 8/6/2009 | 8/7/2009 | 8/7/2009 10:56:34 AM | A | NR |
|
|
Steve Phone #: ###-####
|