Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE12-01969 Rough-In Permanent Service8/7/20128/7/20128/7/2012 3:35:24 PMPCANC
Phone #: ###-#### >> Inspection requested via web by steve cooper
ELE12-01969 Electrical Rough-In8/7/20128/7/20128/7/2012 3:35:18 PMPFAIL
Phone #: ###-#### >> Inspection requested via web by steve cooperPhone #: ###-#### >> Inspection requested via web by steve cooper. Low voltage cables must retain a minimum of 2 inches of separation from high voltage.
ELE12-01969 Permanent Service8/7/20128/7/20128/7/2012 3:02:52 PMPPASS
Phone #: ###-#### >> Inspection requested via web by steve cooper. P/S connect ok.
ELE12-01934 Electrical Rough-In8/7/20128/7/20128/7/2012 2:48:26 PMPPART
trench inspection. Contact is Joel. Phone #: ###-#### >> Inspection requested via web by joel smith. Ok to cover across road.
ELE12-01951 Electrical Rough-In8/7/20128/7/20128/7/2012 1:06:23 PMPPART
trench inspection as early in the afternoon as possible. Eric is the electrician. Thanks Phone #: ###-#### >> Inspection requested via web by joel smith. Needs to make sure and sand conduit in before backfill.
ELE12-01249 Final8/3/20128/7/20128/6/2012 4:23:32 PMACANC
this is a final for adding some lights and outlets to a section of the basement. existing circuits. Phone #: ###-#### >> Inspection requested via web by Mike Cole