Inspections for the day of: Tuesday, August 7, 2012.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00492 FIR-Aging Inspection8/7/20128/7/20128/7/2012 3:48:07 PM PASS
Permit finaled
FIR12-00399 INSP-Final Inspection8/7/20128/7/20128/7/2012 3:46:40 PMPPASS
permit finaled
BLD12-00451 FIRE-Final Inspection8/7/20128/7/20128/7/2012 3:22:44 PMPFAIL
Repair the two exit signs and the exit discharge light at the second floor stairway.
FIR12-00276 INSP-Final Inspection8/7/20128/7/20128/7/2012 3:17:28 PMPPASS
Permit finaled
FIR12-00347 INSP-Supply line flush8/6/20128/7/20128/7/2012 1:53:09 PMAPART
The underground flush failed but the overhead hydro test passed. As per discussion the underground supply line needs to be hydro tested at static plus 50psi for two hours.
BLD12-00534 FIRE-Conference8/6/20128/7/20128/7/2012 1:52:01 PMADONE
Herb and I discussed life safety issues. They included removing the two exit signs in the existing exit corridor that directed people to the service shop, placement of fire extinguishers, fire dept access signs at the property entrance and providing verification of hvac shutdown for the 4,000cfm roof top unit.
FIR12-00276 INSP-Final Inspection8/6/20128/7/20128/7/2012 10:08:16 AMAFAIL
Can't final until all of the ceiling tile has been installed.
FIR12-00298 INSP-Final Inspection8/6/20128/7/20128/7/2012 9:32:18 AMAPASS
Permit finaled