FIR13-00300
| INSP-Final Inspection | 8/7/2013 | 8/7/2013 | 8/9/2013 8:12:37 AM | P | PEND |
|
|
Project description needs modified to reflect actual work completed.
|
FIR09-00443
| FIR-Aging Inspection | 8/7/2013 | 8/7/2013 | 8/9/2013 8:11:56 AM | | DONE |
|
|
|
FIR13-00346
| INSP-Final Inspection | 8/7/2013 | 8/7/2013 | 8/9/2013 8:05:42 AM | P | PASS |
|
|
Fire sprinkler work passed both rough-in and final inspections. Permit finaled.
|
BLD13-01629
| FIRE-Conference | 8/7/2013 | 8/7/2013 | 8/8/2013 9:44:47 AM | P | DONE |
|
|
Regarding fire life safety conditions for occupancy
|
BLD13-01451
| FIRE-Final Inspection | 8/7/2013 | 8/7/2013 | 8/7/2013 2:29:24 PM | P | FAIL |
|
|
C/N items include; provide current certification for the fire extinguisher, post signage at the main entry/exit, provide approved style hardware at office 102 marked exit door.
|
FIR13-00327
| INSP-Sprinkler Rough-in | 8/7/2013 | 8/7/2013 | 8/7/2013 1:24:54 PM | P | PART |
|
|
Overhead modifications are approved for cover at the new offices and adjacent open areas as noted on stamped plans. *One pendent at the lower soffit may yet be relocated due to light fixture adjustments*.
|
FIR13-00309
| INSP-Sprinkler Rough-in | 8/6/2013 | 8/7/2013 | 8/7/2013 1:14:49 PM | A | PART |
|
|
Overhead fire sprinkler work at the new drop ceilings is approved for cover.
|
FIR13-00355
| INSP-Final Inspection | 8/6/2013 | 8/7/2013 | 8/7/2013 1:12:15 PM | A | PASS |
|
|
Fire sprinkler permit final approved.
|
FIR13-00214
| INSP-Supply line flush | 8/5/2013 | 8/7/2013 | 8/7/2013 1:11:17 PM | A | PART |
|
|
UG fire supply line flush completed satisfactory.
|