ESC13-00775
| Site Preparation | 8/1/2013 | 8/1/2013 | | P | |
|
|
|
BLD12-01566
| BLD-Final | 8/2/2013 | 8/2/2013 | | P | |
|
|
shane Phone #: ###-####
|
ESC13-00427
| General Inspection | 8/6/2013 | 8/6/2013 | | | |
|
|
|
BLD13-01962
| BLD-Framing/Rough-in | 8/6/2013 | 8/7/2013 | 8/8/2013 12:05:48 PM | P | PEND |
|
|
Scott Phone #: ###-####,, ok pending electrical
|
BLD13-00036
| BLD-Conference | 8/6/2013 | 8/7/2013 | 8/7/2013 5:07:07 PM | A | PASS |
|
|
footings for patio extension Phone #: ###-#### >> Inspection requested via web by Lawrence Johnson
|
BLD13-01641
| BLD-Framing/Rough-in | 8/7/2013 | 8/7/2013 | 8/7/2013 5:06:04 PM | P | PART |
|
|
robert Phone #: ###-####,, frame ok,, just needs a Boise City plumbing permit
|
BLD13-01932
| BLD-Footing | 8/7/2013 | 8/7/2013 | 8/7/2013 5:03:26 PM | P | PART |
|
|
adam Phone #: ###-####
|
BLD13-01607
| BLD-Framing/Rough-in | 8/6/2013 | 8/7/2013 | 8/7/2013 4:59:18 PM | P | PART |
|
|
doug Phone #: ###-####,, ok to insulate,, need mech looked at again before cover
|
BLD13-01868
| BLD-Framing/Rough-in | 8/6/2013 | 8/7/2013 | 8/7/2013 4:14:36 PM | A | PASS |
|
|
kenji Phone #: ###-####
|
BLD13-01601
| BLD-Conference | 8/6/2013 | 8/7/2013 | 8/7/2013 2:36:26 PM | A | PART |
|
|
prior to final, verify all work is correctly done - tyler Phone #: ###-####,, frame walk through
|
BLD13-00801
| BLD-Final | 8/6/2013 | 8/7/2013 | 8/7/2013 1:19:48 PM | A | PASS |
|
|
Bobby Phone #: ###-####
|
BLD13-00801
| DOC - Permit Finaled | 8/7/2013 | 8/7/2013 | 8/7/2013 1:18:59 PM | P | PASS |
|
|
c of o issued
|