Inspections for the day of: Wednesday, August 7, 2013.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00263 INSP-Sprinkler Rough-in8/7/20138/7/20138/7/2013 3:45:53 PMPPASS
undergroung piping is ok to cover from the United Water connection to the 90 and then 51' along the building. Plan modifications are needed showing the complete routing change and point of connection changes.
FIR13-00338 INSP-Sprinkler Rough-in8/7/20138/7/20138/7/2013 3:40:31 PMPPASS
This was an ug rough in. The 2" poly supply piping is ok to cover up to the United Water connection point at the existing water meter.
BLD13-01770 FIRE-Final Inspection8/7/20138/7/20138/7/2013 3:22:54 PMPPASS
life safety passed
BLD13-02142 FIRE-Final Inspection8/7/20138/7/20138/7/2013 2:00:31 PMPPASS
Life safety passed. Fire extinguisher to be mountedd prior to the building final
BLD13-02107 FIRE-Final Inspection8/7/20138/7/20138/7/2013 1:18:56 PMPFAIL
Called the contact phone number twice and left messages. Had access but could not find any plans. I left message on Rob's voice mail that the two sliding dead bolts would need to be removed from the warehouse doors prior to a sign off and that I had been at the project site. rob Phone #: ###-####
BLD13-01224 FIRE-Final Inspection8/6/20138/7/20138/7/2013 11:28:11 AMAFAIL
Modifications to the existing audio/visual devices is required with-in the remodeled area. As per conversations a temporary occupancy will be given when the fire alarm contractor has submitted for review. All other life safety is ok.
FIR13-00289 INSP-Final Inspection8/7/20138/7/20138/7/2013 10:30:48 AMPPASS
Permit finaled
BLD13-01650 FIRE-Final Inspection8/7/20138/7/20138/7/2013 10:29:15 AMAPASS
Life safety passed.
BLD13-01696 FIRE-Final Inspection8/6/20138/7/20138/7/2013 10:08:43 AMAPASS
Life safety passed. Sprinkler protection at the column not required per NFPA 13 and per Tim the hose valve in the racks will be of no concern.