FIR14-00269
| INSP-Final Inspection | 8/7/2014 | 8/7/2014 | 8/7/2014 5:08:41 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR14-00247
| INSP-Final Inspection | 8/7/2014 | 8/7/2014 | 8/7/2014 5:08:03 PM | P | PASS |
|
|
Scope of demo work completed. Permit finaled.
|
FIR14-00103
| INSP-Sprinkler Rough-in/Hydro | 8/6/2014 | 8/7/2014 | 8/7/2014 5:06:12 PM | A | PART |
|
|
UG fire supply line passed hydrostatic testing.
|
FIR14-00103
| INSP-Supply line flush | 8/6/2014 | 8/7/2014 | 8/7/2014 5:05:26 PM | A | PART |
|
|
UG fire supply line flush completed satisfactory.
|
FIR14-00261
| INSP-Sprinkler Rough-in | 8/6/2014 | 8/7/2014 | 8/7/2014 5:04:26 PM | A | PART |
|
|
Rough-in inspection for the 1st floor retail and live work units completed. Combustible concealed spaces to be sprinklered or meet NFPA 13 exceptions.
|
FIR14-00252
| INSP-Sprinkler Rough-in | 8/6/2014 | 8/7/2014 | 8/7/2014 5:01:54 PM | A | PART |
|
|
Overhead rough-in okay for cover at the 4th floor innovation room sheetrock ceilings and the multi-media room. Noted one damaged pendent sprinkler to be replaced.
|
BLD14-02232
| FIRE-Final Inspection | 8/6/2014 | 8/7/2014 | 8/7/2014 10:20:09 AM | A | FAIL |
|
|
Items noted include plan review red lines and project general requirements- door swing, exit signs/EM lights, door hardware, provide current tag at the fire extinguisher.
|
FIR14-00103
| INSP-Final Inspection | 8/6/2014 | 8/7/2014 | 8/6/2014 1:40:20 PM | A | CANC |
|
|
Jeremiah is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|