Inspections for the day of: Thursday, August 7, 2014.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00269 INSP-Final Inspection8/7/20148/7/20148/7/2014 5:08:41 PMPPASS
Fire sprinkler permit finaled.
FIR14-00247 INSP-Final Inspection8/7/20148/7/20148/7/2014 5:08:03 PMPPASS
Scope of demo work completed. Permit finaled.
FIR14-00103 INSP-Sprinkler Rough-in/Hydro8/6/20148/7/20148/7/2014 5:06:12 PMAPART
UG fire supply line passed hydrostatic testing.
FIR14-00103 INSP-Supply line flush8/6/20148/7/20148/7/2014 5:05:26 PMAPART
UG fire supply line flush completed satisfactory.
FIR14-00261 INSP-Sprinkler Rough-in8/6/20148/7/20148/7/2014 5:04:26 PMAPART
Rough-in inspection for the 1st floor retail and live work units completed. Combustible concealed spaces to be sprinklered or meet NFPA 13 exceptions.
FIR14-00252 INSP-Sprinkler Rough-in8/6/20148/7/20148/7/2014 5:01:54 PMAPART
Overhead rough-in okay for cover at the 4th floor innovation room sheetrock ceilings and the multi-media room. Noted one damaged pendent sprinkler to be replaced.
BLD14-02232 FIRE-Final Inspection8/6/20148/7/20148/7/2014 10:20:09 AMAFAIL
Items noted include plan review red lines and project general requirements- door swing, exit signs/EM lights, door hardware, provide current tag at the fire extinguisher.
FIR14-00103 INSP-Final Inspection8/6/20148/7/20148/6/2014 1:40:20 PMACANC
Jeremiah is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus