FIR14-00792
| INSP-Sprinkler Rough-in | 8/7/2015 | 8/7/2015 | 8/7/2015 4:29:17 PM | P | FAIL |
|
|
RTC inspection for Bldg. H 3rd floor hard lids. Conversation about fire-caulking transpired. Called Jim Storey to confirm requirements. Jim stated that fire cauling required for all wall penetrations between the rooms and the corridor, as well as the walls separating the unit rooms. Therefore, more caulking is required, as many of the walls separating units were not fire caulked. Will reschedule when completed.
|
BLD14-00681
| FIRE-Final Inspection | 8/7/2015 | 8/7/2015 | 8/7/2015 4:25:21 PM | P | PASS |
|
|
Final FireLife-Safety inspection. Fire sprinklers and fire alarm systems signed off. Exit signage and EM lighting completed. EVAC signs posted in elevator lobbies. Fire access road completed on south side of building. Need to add two (2) addtional "No Parking" signs for cul-de-sac that leads into the fire access road. Fire extinguishers located throughout. NOTE: Per BO email, elevator lobbies not longer required per latest ICC interp. Signed off Bldg. Permit inspection card for full occupancy.
|
FIR15-00096
| INSP-Sprinkler Rough-in | 8/6/2015 | 8/7/2015 | 8/7/2015 4:17:38 PM | P | PART |
|
|
4th floor RTC inspection for the entire north and south corridors. Exit signs near units, 412, 418, 426, and 429 are currently obstructing the sprinklers near these units, and will have to be relocated to provide proper clearance. Otherwise - OK to cover the pipe in this corridor (4th level).
|
FIR15-00096
| INSP-Sprinkler Rough-in/Hydro | 8/6/2015 | 8/7/2015 | 8/7/2015 4:15:15 PM | P | PASS |
|
|
Hydrostatic test of 2nd and 3rd floor wet systems - north and south sides. 200 psi @ 2 hours - all passed
|
FIR14-00603
| INSP-Final Inspection | 8/6/2015 | 8/7/2015 | 8/7/2015 4:13:44 PM | A | PART |
|
|
Final inspection for garage dry pipe systems. Final passed, except for record of completion (ROC) paperwork not completed yet.
|
FIR14-00815
| INSP-Final Inspection | 8/6/2015 | 8/7/2015 | 8/7/2015 4:12:20 PM | A | PART |
|
|
Final inspection of all sprinkler systems for above parking garage levels. Need riser placards on some risers, need signs for exterior wall hydrants, Need to replace riser gauge on southeast stairwell - 4th level. ROC paperwork not completed this visit.
|
FIR13-00724
| INSP-Alarm Testing | 8/7/2015 | 8/7/2015 | 8/7/2015 4:09:09 PM | A | PART |
|
|
Test of elevator recall functions for service elevator and main elevator - the third elevator not ready for testing. All elevator functions tested OK. Shunt trip power monitoring not tested this visit.
|
FIR14-00365
| INSP-Final Inspection | 8/6/2015 | 8/7/2015 | 8/7/2015 4:06:53 PM | A | PART |
|
|
Final inspection for Helix structure and above ground parking garage, and all rooms located above the parking garage. NOTE: Some DP heads in the parking garage not installed yet. Some other minor punchlist items remain that will require re-inspection. Also, exterior alarm bell required to be installed near exterior of the command center, and be tied into all waterflow alarms to indicate a water flow from any system within the structure.
|
FIR14-00252
| INSP-Final Inspection | 8/6/2015 | 8/7/2015 | 8/7/2015 4:03:29 PM | A | PASS |
|
|
Final inspection for kitchen and lobby area. Need calc placard installed. Otherwise, past final inspection.
|
FIR14-00792
| INSP-Sprinkler Rough-in | 8/7/2015 | 8/7/2015 | 8/7/2015 10:40:39 AM | P | CANC |
|
|
TOB Bldg H wet RTC Please call Leroy 30 min prior ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|