PLM17-02925
| Sprinkler (Final) | 8/4/2017 | 8/7/2017 | 8/7/2017 4:51:40 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Soubanh Senethavialy
|
PLM17-02935
| Water and/or Sewer | 8/7/2017 | 8/7/2017 | 8/7/2017 4:34:20 PM | P | FAIL |
|
|
George-Sewer only Phone #: ###-####. The grease interceptor must vent from the outlet side. See drawing provided. There is a section of the sewer, at the transition coupling that is flat
|
PLM17-02845
| Water Heater Final | 8/4/2017 | 8/7/2017 | 8/7/2017 3:38:59 PM | P | FAIL |
|
|
Hello! Please call Robert @ ###-#### to confirm job is ready for inspection. Thank you! Phone #: ###-#### Inspection requested via web by Rick Borg. 1. The T&P must drain to the outside of the building. If trapped drill a 1/16" hole at the lowest point. Do not use a flex connector.. 2 The drain pan must drain outside. If you can't get grade install a water alarm in the pan
|
PLM17-00118
| Final | 8/7/2017 | 8/7/2017 | 8/7/2017 2:53:25 PM | P | PASS |
|
|
call for access- Alan Phone #: ###-####
|
PLM17-01815
| Final | 8/7/2017 | 8/7/2017 | 8/7/2017 2:21:16 PM | P | PASS |
|
|
|
PLM17-01767
| Final | 8/7/2017 | 8/7/2017 | 8/7/2017 2:21:01 PM | P | PASS |
|
|
|
PLM17-02929
| Sprinkler (Final) | 8/7/2017 | 8/7/2017 | 8/7/2017 2:19:23 PM | P | PASS |
|
|
Jose Phone #: ###-####
|
PLM17-02928
| Sprinkler (Final) | 8/7/2017 | 8/7/2017 | 8/7/2017 2:19:08 PM | P | PASS |
|
|
Jose Phone #: ###-####
|
PLM17-02841
| Sprinkler (Final) | 8/7/2017 | 8/7/2017 | 8/7/2017 2:00:44 PM | P | PASS |
|
|
Deborah Phone #: ###-####
|
PLM17-00922
| Final | 8/4/2017 | 8/7/2017 | 8/7/2017 11:23:33 AM | A | PASS |
|
|
Please call 30 minutes prior to inspection. MEC inspection at the same time this morning. Phone #: ###-#### Inspection requested via web by Andrea Grigsby
|
PLM17-02884
| Water and/or Sewer | 8/4/2017 | 8/7/2017 | 8/7/2017 10:53:10 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Adrian Inama Inspection cancelled from web by: Adrian Inama
|
PLM17-02882
| Water and/or Sewer | 8/4/2017 | 8/7/2017 | 8/7/2017 10:53:01 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Adrian Inama Inspection cancelled from web by: Adrian Inama
|
PLM17-02930
| Water and/or Sewer | 8/6/2017 | 8/7/2017 | 8/7/2017 10:32:02 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by matt ford
|
PLM17-02930
| Final | 8/7/2017 | 8/7/2017 | 8/7/2017 10:31:50 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by matt ford
|
PLM17-02931
| Water and/or Sewer | 8/6/2017 | 8/7/2017 | 8/7/2017 10:31:25 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by matt ford
|
PLM17-02931
| Final | 8/7/2017 | 8/7/2017 | 8/7/2017 10:31:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by matt ford
|
PLM17-02932
| Water and/or Sewer | 8/6/2017 | 8/7/2017 | 8/7/2017 10:29:32 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by matt ford
|
PLM17-02932
| Final | 8/7/2017 | 8/7/2017 | 8/7/2017 10:29:21 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by matt ford
|
PLM17-02284
| Final | 8/7/2017 | 8/7/2017 | 8/7/2017 10:28:37 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers
|
PLM17-01655
| Final | 8/4/2017 | 8/7/2017 | 8/7/2017 9:23:18 AM | A | PASS |
|
|
JOB # 50710. Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM17-02907
| Final | 8/7/2017 | 8/7/2017 | 8/7/2017 8:16:27 AM | A | PASS |
|
|
|
PLM17-02907
| Other | 8/5/2017 | 8/7/2017 | 8/7/2017 8:15:08 AM | A | PASS |
|
|
Install transition coupling on sewer connection. Picture sent on Saturday. Thanks! Phone #: ###-#### Inspection requested via web by Troy Woolston
|
PLM17-02501
| Plumbing Rough-in | 8/4/2017 | 8/7/2017 | 8/4/2017 8:28:04 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Nicholas Paige Inspection cancelled from web by: Nicholas Paige
|