BLD17-00341
| BLD-Framing/Rough-in | 8/7/2017 | 8/7/2017 | 8/7/2017 6:16:42 PM | P | PART |
|
|
Chris Phone #: ###-####,, a couple corrections
|
BLD17-02242
| BLD-Final | 8/4/2017 | 8/7/2017 | 8/7/2017 6:14:35 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Christian Kilpatrick// needs electrical 1st
|
BLD17-00978
| BLD-Final | 8/4/2017 | 8/7/2017 | 8/7/2017 6:13:40 PM | P | PEND |
|
|
Mandy Phone #: ###-####
|
BLD16-03251
| BLD-Framing/Rough-in | 8/7/2017 | 8/7/2017 | 8/7/2017 6:11:29 PM | P | PASS |
|
|
entry - Biff Phone #: ###-####
|
BLD17-02204
| BLD-Footing | 8/7/2017 | 8/7/2017 | 8/7/2017 3:15:18 PM | P | PASS |
|
|
Call half hour before to meet // Harlan Phone #: ###-####
|
BLD17-01472
| BLD-Footing | 8/7/2017 | 8/7/2017 | 8/7/2017 2:53:15 PM | P | PEND |
|
|
Inspection can be done later in the AM. Jimmy will be doing the installation and his cell number is ###-####. We will have the MTI subgrade report with us. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD17-02720
| BLD-Conference | 8/4/2017 | 8/7/2017 | 8/7/2017 2:52:15 PM | P | PASS |
|
|
Ryan Phone #: ###-####,, conf on job
|
BLD17-00249
| BLD-Energy code compliance | 8/4/2017 | 8/7/2017 | 8/7/2017 2:51:20 PM | A | PASS |
|
|
larry Phone #: ###-####
|
BLD17-02720
| BLD-Conference | 8/4/2017 | 8/7/2017 | 8/7/2017 1:36:14 PM | A | PASS |
|
|
Ryan Phone #: ###-####,, looks good,, just needs trades passed on rough,, ok to cover unaffected areas
|
BLD17-02626
| BLD-Footing | 8/4/2017 | 8/7/2017 | 8/7/2017 12:31:54 PM | A | PASS |
|
|
Chris Phone #: ###-####
|
BLD16-00890
| BLD-Final | 8/4/2017 | 8/7/2017 | 8/7/2017 10:07:54 AM | A | PASS |
|
|
I have some interior trim to do and painting on the outside but was told I should get the inspection for the structure. Thanx, Jim Phone #: ###-#### Inspection requested via web by James Friedrich
|
BLD16-00890
| DOC - Permit Finaled | 8/7/2017 | 8/7/2017 | 8/7/2017 10:07:50 AM | P | PASS |
|
|
|
BLD17-00341
| BLD-Framing/Rough-in | 8/4/2017 | 8/7/2017 | 8/7/2017 10:06:57 AM | A | PEND |
|
|
Chris Phone #: ###-####,, ok to start foam base layer,, needs sprinkler pass
|
BLD17-01472
| BLD-Footing | 8/4/2017 | 8/7/2017 | 8/7/2017 10:05:10 AM | A | PEND |
|
|
Inspection can be done later in the AM. Jimmy will be doing the installation and his cell number is ###-####. We will have the MTI subgrade report with us. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD17-02254
| BLD-Final | 8/3/2017 | 8/7/2017 | 8/4/2017 1:39:57 PM | P | CANC |
|
|
Call if any questions Phone #: ###-#### >> Inspection requested via web by Christian Kilpatrick Inspection cancelled from web by: Christian Kilpatrick
|