ELE18-00598
| Final | 8/7/2018 | 8/7/2018 | 8/7/2018 2:39:54 PM | P | PASS |
|
|
Per Dave H Ok final. I talked to Perry the electrician. There was a condensate pump installed for new furnace in ceiling. Right now there is an extension cord being used for power for this pump. I scheduled an inspection for 8/16/18 to touch base with Perry. Power is going to be supplied for this pump via junction box.
|
ELE18-02982
| Electrical Rough-In | 8/7/2018 | 8/7/2018 | 8/7/2018 2:39:53 PM | P | PASS |
|
|
Justin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Ok cover 2 offices 2nd floor NW side.
|
ELE18-02936
| Temporary Service | 8/7/2018 | 8/7/2018 | 8/7/2018 1:47:04 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
|
ELE18-02935
| Temporary Service | 8/7/2018 | 8/7/2018 | 8/7/2018 1:47:04 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
|
ELE18-02813
| Final | 8/7/2018 | 8/7/2018 | 8/7/2018 12:55:09 PM | P | PASS |
|
|
Rod Phone #: ###-#### Ok final. No other work was done. I added a p/s to this permit number. Contractor had called in for a final only.
|
ELE18-02813
| Permanent Service | 8/7/2018 | 8/7/2018 | 8/7/2018 12:54:00 PM | P | PASS |
|
|
p/s o/h n ok
|
ELE18-02313
| Electrical Rough-In | 8/7/2018 | 8/7/2018 | 8/7/2018 12:45:15 PM | P | PASS |
|
|
We need an underground cover inspection on the east side of the project please. Thank you. Phone #: ###-#### Inspection requested via web by Tom Jenkins Ok cover 4-4" on secondary side of trans to new construction of school gym.
|
ELE18-01232
| Final | 8/7/2018 | 8/7/2018 | 8/7/2018 12:41:27 PM | P | PASS |
|
|
Garage code 7956 Phone #: ###-#### Inspection requested via web by Therrin Robertson Ok final. Room off W side of garage is listed as a fitness room on the plans.
|
ELE18-02981
| Temporary Service | 8/7/2018 | 8/7/2018 | 8/7/2018 11:01:39 AM | P | PASS |
|
|
Please call Eric with any questions ###-#### Phone #: ###-#### Inspection requested via web by Bonnie Page t/s u/g n ok
|
ELE18-02942
| Rough-In Permanent Service | 8/7/2018 | 8/7/2018 | 8/7/2018 10:12:25 AM | A | PASS |
|
|
Any questions please let us know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren p/s u/g n ok
|
ELE18-02780
| Electrical Rough-In | 8/6/2018 | 8/7/2018 | 8/7/2018 8:37:39 AM | A | PASS |
|
|
Rough and Cover Inspection Phone #: ###-#### Inspection requested via web by Angela Stears Ok cover. On previous inspection, a wall had been framed over top an outlet. Wall was moved, as outlet is going to be utilized.
|
ELE18-02907
| Final | 8/6/2018 | 8/7/2018 | 8/7/2018 8:22:29 AM | A | PASS |
|
|
Please contact Tate Borstelman w/questions Phone #: ###-#### Inspection requested via web by JENNY EMEL Ok final. Looked at on 8/6/18 during solar final.
|
ELE16-04165
| Electrical Rough-In | 8/6/2018 | 8/7/2018 | 8/7/2018 8:21:42 AM | A | CANC |
|
|
This is for the conduit running through the garage floor. I am sorry it wasn’t ready Friday. They messed around and I forgot that I had called an inspection. Phone #: ###-#### Inspection requested via web by Craig Korell Inspection was done by Eric on 8/3/18. This inspeciton was called in by mistake.
|