Inspections for the day of: Wednesday, August 7, 2019.
Number of inspections: 2
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDan Ediger
TitlePLM-INSPECTOR
Phone #869-5166
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM19-03218 Other8/6/20198/7/20198/7/2019 3:56:48 PMPFAIL
1:30 conferance
1. Relocate solar storage tank off the platform. The water heater must be readily accessible.
2. Insulate the solar water lines the entire distance.
3. Install a bleeder valve on the solar panals at the high point.
4. provide written instructions for winterization of the thermal system.
5. Tag all valves with their functions.
6. All work must be done by the permit holder or a licensed Journeyman.
PLM19-03275 Plumbing Rough-in8/7/20198/7/20198/7/2019 2:55:59 PMPPASS
Phone #: ###-#### Inspection requested via web by Kristy Watson