ESC18-00020
| General Inspection | 8/7/2020 | 8/7/2020 | 8/11/2020 11:40:38 AM | | PASS |
|
|
No new activity at site. Finishing up on a few homes. No issues.
|
ESC18-01089
| General Inspection | 8/7/2020 | 8/7/2020 | 8/11/2020 11:26:05 AM | | PASS |
|
|
No new construction activity on foxgrove. Landscapers are tracking some dirt onto roads and sidewalks.
|
ESC18-00983
| General Inspection | 8/7/2020 | 8/7/2020 | 8/11/2020 10:19:25 AM | | PASS |
|
|
WIp on homes on Mendota, all slabs have been poured. WIP on footings and slabs on south side of Donzee, large lined washout on north side, no dumped washout on any sites. WIP on framing on tiger lilly. Crerw is starting work on western end of neighborhood. Water and sewer pipes staged. Did not see a water truck.
|
ESC19-01320
| General Inspection | 8/7/2020 | 8/7/2020 | 8/11/2020 9:15:42 AM | P | PASS |
|
|
Sidewalks and curbing completed. Thueson is on site starting to pave. Large stockpiles on site.
|
ESC20-00881
| General Inspection | 8/7/2020 | 8/7/2020 | 8/10/2020 9:24:42 AM | P | CANC |
|
|
check for concrete washout
|
ESC20-00116
| General Inspection | 8/7/2020 | 8/7/2020 | 8/10/2020 9:20:59 AM | P | PASS |
|
|
Large landscape crew on site, work about finished. They were sweeping street.
|
ESC19-01614
| Site Final | 8/7/2020 | 8/7/2020 | 8/10/2020 9:20:22 AM | P | PASS |
|
|
|
ESC20-00118
| Site Final | 8/7/2020 | 8/7/2020 | 8/10/2020 9:19:58 AM | P | PASS |
|
|
|
ESC19-01178
| Aging Inspection | 8/7/2020 | 8/7/2020 | 8/7/2020 12:01:49 PM | | PASS |
|
|
ADU looks completed, driveway is stone.
|
ESC19-01548
| General Inspection | 8/7/2020 | 8/7/2020 | 8/7/2020 11:53:12 AM | P | PASS |
|
|
Landscaping almost complete.
|
ESC19-01427
| General Inspection | 8/7/2020 | 8/7/2020 | 8/7/2020 11:52:17 AM | | PASS |
|
|
All work is interior. Lots of vegetation growth.
|
ESC17-00842
| General Inspection | 8/7/2020 | 8/7/2020 | 8/7/2020 11:43:30 AM | | PASS |
|
|
Development in good shape. 2 lots currently building. No issues.
|
ESC19-01422
| Aging Inspection | 8/7/2020 | 8/7/2020 | 8/7/2020 11:37:55 AM | | PASS |
|
|
Work looks completed, no disturbances.
|
ESC19-01555
| General Inspection | 8/3/2020 | 8/7/2020 | 8/7/2020 10:59:06 AM | A | PASS |
|
|
No activity. Silt fence still along north perimeter. Site is all overgrown, test pit still open, no equip,ment on site.
|
ESC19-01321
| Aging Inspection | 8/7/2020 | 8/7/2020 | 8/7/2020 10:55:02 AM | | CANC |
|
|
|
ESC19-01321
| DOC - Permit Finaled | 8/7/2020 | 8/7/2020 | 8/7/2020 10:54:56 AM | P | PASS |
|
|
|
ESC19-00160
| General Inspection | 8/7/2020 | 8/7/2020 | 8/7/2020 10:34:05 AM | | PASS |
|
|
WIP on framing on all buildings, no current concrete work. All areas have trash bins, still some small stuff on ground. A few workers parked on empty lot across street. No dust, trackout, or anything leaving site.
|
ESC19-01602
| General Inspection | 8/7/2020 | 8/7/2020 | 8/7/2020 10:33:07 AM | P | PASS |
|
|
Getting ready to set forms. Sent message to rp to remind them to use washout.
|
ESC19-01612
| General Inspection | 8/7/2020 | 8/7/2020 | 8/7/2020 10:32:49 AM | P | PASS |
|
|
Getting ready to set forms. Sent message to rp to remind them to use washout.
|
ESC20-00144
| General Inspection | 8/7/2020 | 8/7/2020 | 8/7/2020 9:17:03 AM | P | PASS |
|
|
Exterior work, parking lot, and landscaping completed. Job trailer and material storage has moved to south lot.
|