BLD1055866
| INSP - Energy code compliance | 8/8/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | | PASS |
|
|
/ / 342 - 44. was done before. 10 min
|
BLD1055866
| INSP - Framing/ Rough-in | 8/8/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | | PASS |
|
|
/ / 342 - 09. was completed before. 10 min
|
BLD95-00180
| INSP - Framing/ Rough-in | 8/8/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | | PASS |
|
|
/ / 342 - 09. OK. 20 MIN. HAE TRUSS ENG IN SITE
|
BLD95-00193
| INSP - Framing/ Rough-in | 8/8/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | | PASS |
|
|
/ / 342 - 09. OK. HAE TRUSS ENGINEERING ON SITE. 20 MIN
|
BLD95-00283
| INSP - Framing/ Rough-in | 8/8/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | | PASS |
|
|
/ / 342 - 09. OK. 20 MIN
|
BLD95-00189
| INSP - Conference | 8/7/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | A | PASS |
|
|
08/07/95 342 - 01. ok. notified of fees due. 40 min
|
BLD95-00737
| INSP - Roof | 8/7/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | A | NR |
|
|
08/08/95 342 - not ready for final yet. 15 min
|
BLD1056031
| INSP - Final | 8/7/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | A | NR |
|
|
08/07/95 342 - 14. no insps. 20 min
|
BLD1056394
| INSP - Energy code compliance | 8/7/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | A | PASS |
|
|
08/07/95 342 - 44. c/n remoed. still need to blk beneath rafter heels in
|
BLD1056394
| INSP - Energy code compliance | 8/7/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | A | PASS |
|
|
08/07/95 342 - 44. c/n remoed. still need to blk beneath rafter heels in
|
BLD1055866
| INSP - Final | 8/7/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | A | FAIL |
|
|
08/07/95 342 - 14. c/n . 25 min
|
BLD1052275
| INSP - Final | 8/8/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | P | NR |
|
|
08/08/95 342 - 14. IS A 42. NR 30 MIN
|
BLD1055626
| INSP - Framing/ Rough-in | 8/8/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | P | PASS |
|
|
08/08/95 342 - 09. ok. as to two restroom doors and adjoining walls. 20
|
BLD95-00594
| INSP - Framing/ Rough-in | 8/8/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | P | PASS |
|
|
08/08/95 342 - KEY AT BASE OF STAIRS -LEFT HAND SIDE UNDER ROCK. UNIT 10 FRAM-OK FRAMING, REPAIR G.W.B. AND BURNT FAN FLEX. 20 MIN
|
BLD95-00223
| INSP - Framing/ Rough-in | 8/8/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | P | FAIL |
|
|
08/08/95 342 - 09. c/n. 20 min
|
BLD95-00227
| INSP - Framing/ Rough-in | 8/8/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | P | FAIL |
|
|
08/08/95 342 - 09. NOT CLOSE TO BEING READY ... IF I HAD RIGHT STRUCTURE SITE INFO. IF RIGHT STRUCTURE $30 FEE DUE. NO INSPECTIONS, ELECT STILL R WIRE. 30 MIN
|
BLD95-00185
| INSP - Energy code compliance | 8/8/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | P | NR |
|
|
08/08/95 342 - 44. OK. NO C/N POSTED AND JOB NOT IDENTIFIED. 20 MIN
|
BLD95-00185
| INSP - Energy code compliance | 8/8/1995 | 8/8/1995 | 8/8/1995 12:00:00 AM | P | NR |
|
|
08/08/95 342 - 44. OK. NO C/N POSTED AND JOB NOT IDENTIFIED. 20 MIN
|