BLD96-00655
| INSP - Framing/Rough-in | 8/7/1996 | 8/8/1996 | 8/9/1996 12:00:00 AM | A | CANC |
|
|
08/08/96 316 - Inspected previously. Cancel.
|
MEC96-02220
| INSP - Framing/ Rough-in | 8/8/1996 | 8/8/1996 | 8/8/1996 12:00:00 AM | | PASS |
|
|
/ / 316 - C/N Removed.
|
BLD96-00309
| INSP - Conference | 8/8/1996 | 8/8/1996 | 8/8/1996 12:00:00 AM | | PASS |
|
|
/ / 316 - Walk thru before final inspection.
|
BLD96-00309
| INSP - Conference | 8/8/1996 | 8/8/1996 | 8/8/1996 12:00:00 AM | | PASS |
|
|
/ / 316 - Walk thru before final inspection.
|
MEC96-02220
| INSP - Framing/ Rough-in | 8/7/1996 | 8/8/1996 | 8/8/1996 12:00:00 AM | A | FAIL |
|
|
08/07/96 316 - Need to complete C/N for single wall clearance.
|
BLD96-00655
| INSP - Energy code compliance | 8/7/1996 | 8/8/1996 | 8/8/1996 12:00:00 AM | A | PASS |
|
|
08/07/96 316 -
|
BLD96-01169
| INSP - Footings | 8/8/1996 | 8/8/1996 | 8/8/1996 12:00:00 AM | P | NR |
|
|
08/08/96 316 - LATE P.M. Not Ready
|
BLD96-00537
| INSP - Flatwork | 8/8/1996 | 8/8/1996 | 8/8/1996 12:00:00 AM | P | PASS |
|
|
08/08/96 316 - SLAB FLR OK. ì
|