PLM96-02300
| INSP - Plumbing Rough-in | 8/7/1996 | 8/8/1996 | 8/8/1996 12:00:00 AM | A | FAIL |
|
|
08/08/96 330 - BJ FROM A-1 CALLED TO CANCEL 8-7-96 AM INSPECTION AND RE- AM. hang service piping, waste test failed, 21 fu on 3/4" poly, drop ea at hosebibs, check grade on 3" waste.
|
PLM96-02315
| INSP - Sprinkler & Backflow | 8/7/1996 | 8/8/1996 | 8/8/1996 12:00:00 AM | A | PASS |
|
|
08/08/96 330 -
|
PLM96-02323
| INSP - Sewer line | 8/8/1996 | 8/8/1996 | 8/8/1996 12:00:00 AM | P | PART |
|
|
08/08/96 330 - outside only ok
|
PLM96-02328
| INSP - Sewer and Water lines | 8/8/1996 | 8/8/1996 | 8/8/1996 12:00:00 AM | P | PASS |
|
|
08/08/96 330 - WILL BE READY AFTER 12:30PM
|
PLM96-02330
| INSP - Sewer and Water lines | 8/8/1996 | 8/8/1996 | 8/8/1996 12:00:00 AM | P | PASS |
|
|
08/08/96 330 - WILL BE READY AFTER 4PM
|
PLM96-02331
| INSP - Plumbing Rough-in | 8/8/1996 | 8/8/1996 | 8/8/1996 12:00:00 AM | P | PART |
|
|
08/08/96 330 - FIRE DAMAGE REPAIR partial r/i ok two tubs CENTER GARAGE DOOR OPEN
|
PLM96-01051
| INSP - Final | 8/8/1996 | 8/8/1996 | 8/8/1996 12:00:00 AM | P | PASS |
|
|
08/08/96 330 -
|
PLM96-02293
| INSP - Ground work | 8/8/1996 | 8/8/1996 | 8/8/1996 12:00:00 AM | P | PASS |
|
|
08/08/96 330 - done it
|