FIR00-00072
| INSP-Sprinkler Rough-in/Hydro | 8/7/2000 | 8/8/2000 | 8/8/2000 12:00:00 AM | A | PART |
|
|
hydro on the underground and a flush ###-#### don pager hydro okay on underground 8/8/2000 11:22:53 AM
|
FIR00-00072
| INSP-Supply line flush | 8/8/2000 | 8/8/2000 | 8/8/2000 12:00:00 AM | A | NR |
|
|
not ready to test FDC 8/8/2000 11:23:22 AM
|
BLD99-03348
| FIRE-Alarm Testing | 8/8/2000 | 8/8/2000 | 8/8/2000 12:00:00 AM | P | FAIL |
|
|
Jim ###-#### tested the alarms: batteries need to be 55 amp; trouble on NACs activate the alarms; complete the wiring/horns in attice; F/S dampers not tested - not accessible; need exit sign; 2 hr and 1 hr wall penetrations 8/9/2000 8:40:30 AM
|
BLD00-01306
| FIRE-Final Inspection | 8/8/2000 | 8/8/2000 | 8/8/2000 12:00:00 AM | P | PASS |
|
|
DAVID-- ###-#### FIRE FN
|
FIR00-00072
| INSP-Supply line flush | 8/8/2000 | 8/8/2000 | 8/8/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 409 On 8/8/2000 undergound flush of FDC and supply line okay 8/9/2000 8:28:36 AM
|