BLD96-00200
| BLD-Final | 8/6/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | A | FAIL |
|
|
###-####
|
BLD96-02987
| BLD-Final | 8/6/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | A | FAIL |
|
|
###-#### need si 8/8/2001 11:35:11 AM
|
BLD97-02272
| BLD-Final | 8/6/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | A | PASS |
|
|
###-#### final ok l/c 8/8/2001 11:34:46 AM
|
BLD98-01809
| BLD-Final | 8/6/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | A | PASS |
|
|
###-#### final ok l/c 8/8/2001 11:36:38 AM
|
BLD99-03180
| BLD-Final | 8/6/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | A | PASS |
|
|
###-#### final ok. this was a occ. change to f-1 check with plan review if co or lc? 8/8/2001 10:36:08 AM
|
BLD00-00961
| BLD-Final | 8/6/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | A | PASS |
|
|
###-#### final ok l/c 8/8/2001 10:36:36 AM
|
BLD99-01584
| BLD-Final | 8/6/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | A | FAIL |
|
|
###-#### n/r 8/8/2001 11:36:05 AM
|
BLD00-02751
| BLD-Final | 8/7/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | A | FAIL |
|
|
n/r 8/8/2001 11:35:43 AM
|
BLD96-02525
| BLD-Final | 8/8/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 301 On 8/8/2001 10:32:02 AM l/c ok for tank pad.
|
BLD01-01514
| BLD-Final | 8/8/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 301 On 8/8/2001 10:29:19 AM final ok for l/c racking instal.
|
BLD01-00197
| BLD-Framing/Rough-in | 8/8/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | P | PART |
|
|
FR ###-####- PAT went trrough racking /handrail c/n 8/8/2001 12:58:16 PM
|
BLD00-03227
| BLD-Other | 8/7/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 16:37:30. Contact: ###-####. need mech insp not bld. 8/8/2001 3:01:06 PM
|
BLD00-03068
| BLD-Other | 8/7/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 17:35:43. Contact: ###-####. delli primitor wires/ break rm primitor wires 8/8/2001 3:00:20 PM
|
BLD01-01709
| BLD-Framing/Rough-in | 8/8/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 07:51:28. Contact: ###-####. brace wall panel nailling as per plan ok for cover. 8/8/2001 3:59:00 PM
|
BLD00-02920
| BLD-Wall cover | 8/8/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 07:52:42. Contact: ###-####. basement chem rooms firestopping ok pending engineered judgments for 2 locations/ 8/9/2001 10:49:19 AM
|
BLD00-02670
| BLD-Final | 8/8/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | P | PASS |
|
|
###-#### final ok 8/8/2001 1:59:31 PM
|
BLD00-02669
| BLD-Final | 8/8/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | P | FAIL |
|
|
need plm and smoke dect in bedrooms. 8/8/2001 2:11:38 PM
|