Inspections for the day of: Wednesday, August 8, 2001.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00652 BLD-Foundation8/7/20018/8/20018/8/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/07/2001 at 14:20:39. Contact: ###-####. ok pend report 8/8/2001 8:33:03 AM
BLD00-01614 BLD-Final8/7/20018/8/20018/8/2001 12:00:00 AMAPASS
Terry, ###-#### - let Cathy know if bond can be returned for driveway, ok for bond relea se8/8/2001 12:02:19 PM se 8/8/2001 12:02:24 PM 8/8/2001 12:02:35 PM
BLD01-00655 BLD-Foundation8/7/20018/8/20018/8/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/07/2001 at 15:32:50. Contact: ###-####...ok pend report 8/8/2001 8:32:45 AM
BLD01-02088 BLD-Conference8/8/20018/8/20018/8/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 8/8/2001 8:12:27 AM w/fnd contractor...re steel, ok per plans
BLD01-00600 BLD-Foundation8/8/20018/8/20018/8/2001 12:00:00 AMAPART
###-####; slab ok 8/8/2001 3:32:09 PM
BLD00-01614 BLD-Final8/8/20018/8/20018/8/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 8/8/2001 1:52:24 PM driveway ok for bond release/final
BLD00-02766 BLD-Final8/8/20018/8/20018/8/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 8/8/2001 2:38:39 PM demo ok
BLD01-00234 BLD-Conference8/8/20018/8/20018/8/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 8/8/2001 4:42:11 PM w/ Wendall at site, re stair & elev shafts; complete r/i's for cover of other areas
BLD00-02233 BLD-Final8/7/20018/8/20018/8/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 08/07/2001 at 07:31:18. Contact: ###-####.recall 8/9/2001 8:31:06 AM
BLD01-01556 BLD-Framing/Rough-in8/7/20018/8/20018/8/2001 12:00:00 AMPPART
9415036 8/7/2001 5:01:06 PM; 1st floor ok pend elec. 8/8/2001 3:32:36 PM
BLD00-02827 BLD-Final8/7/20018/8/20018/8/2001 12:00:00 AMPPASS
FN OCC DICK ###-####--AROUND 2:00????? ok, cards to contractor; plbg ok, was for demo only. 8/8/2001 2:37:59 PM
BLD00-03549 BLD-Final8/8/20018/8/20018/8/2001 12:00:00 AMPNR
rod-- ###-#### fn ; need card, other ok's 8/8/2001 10:58:06 AM
BLD01-00252 BLD-Framing/Rough-in8/8/20018/8/20018/8/2001 12:00:00 AMPPART
perry ###-#### fr insp , cover or remove paneling <1/4" at stairs. headroom issue ok as is existing condition 8/8/2001 1:47:51 PM
BLD01-01297 BLD-Framing/Rough-in8/8/20018/8/20018/8/2001 12:00:00 AMPPART
FR INSP TOM - ###-####; ADA restrooms appear ok, reviewed plans; chk actual clr at final 8/8/2001 3:33:27 PM
BLD01-00234 BLD-Framing/Rough-in8/8/20018/8/20018/8/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/08/2001 at 07:31:59. Contact: ###-####. c/n firestops, 1st fl areas c&d. ok to continue or begin wall cover. 8/9/2001 1:01:19 PM