BLD01-00195
| BLD-Final | 8/7/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-01275
| BLD-Framing/Rough-in | 8/7/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 12:54:37. Contact: ###-####.
|
BLD01-01441
| BLD-Framing/Rough-in | 8/7/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-00533
| BLD-Final | 8/7/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | A | PASS |
|
|
T. Records ok as long as no landscape has changed 8/7/2001 3:43:37 PM
|
BLD01-01179
| BLD-Framing/Rough-in | 8/8/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | P | PART |
|
|
fr insp- jim ###-#### c/n posted, ok to insulate after trades are signed off 8/8/2001 4:41:05 PM
|
BLD01-01679
| BLD-Framing/Rough-in | 8/8/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | P | PART |
|
|
fr insp ted- ###-####
ok to cover int. non bearing walls on east unit north side 8/8/2001 4:58:04 PM
|
BLD01-02162
| BLD-Conference | 8/8/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD01-02162
| BLD-Conference | 8/8/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | P | PASS |
|
|
BOB ###-#### FOR CONF
conf. on set backs, ftgs, beam, etc.// will dig out ftgs to see and will go back to plan review on set backs. 8/8/2001 3:13:21 PM
|
BLD01-01691
| BLD-Footing | 8/8/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | P | NR |
|
|
FT INSP GERAD- ###-####
need soils test and T. Records approval 8/8/2001 2:13:58 PM
|
BLD01-01275
| BLD-Energy code compliance | 8/8/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 415 On 8/8/2001 12:44:00 PM
|
BLD01-01479
| BLD-Final | 8/7/2001 | 8/8/2001 | 8/8/2001 12:00:00 AM | P | PART |
|
|
###-#### call first to meet for access
should change address 1429 hill to a tamarack address for safty concern. all else ok 8/8/2001 3:33:53 PM
|