PLM02-02399
| Sprinkler (Final) | 8/5/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PART |
|
|
###-#### joey 160 min psi piping upstream of dcva, two clamps required at each joint upstream of the dcva, two unions required on the dcva installed below grade, ok to cover tie in. 8/8/2002 10:00:34 AM
|
PLM02-00228
| Final | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/07/2002 at 11:36:35. Contact: ###-####. set kitchen sinks in units 302,202,102,104,204 304, temp occ ok 8/8/2002 9:01:35 AM
|
PLM02-02456
| Water and/or Sewer | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PASS |
|
|
JAN ###-####
|
PLM02-02456
| Sprinkler (Final) | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PASS |
|
|
JAN ###-####
|
PLM02-02422
| Plumbing Rough-in | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PART |
|
|
###-#### 8/8/2002 8:32:32 AMtilty room gw ok 8/8/2002 8:32:41 AM
|
PLM02-00340
| Final | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 08/07/2002 at 15:52:01. Contact: . still missing parts 8/8/2002 10:29:49 AM
|
PLM02-02417
| Plumbing Rough-in | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/07/2002 at 17:17:22. Contact: ###-####.
|
PLM02-00340
| Final | 8/8/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | P | PART |
|
|
temp occ ok 8/8/2002 2:57:21 PM
|