PLM02-01952
| Final | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PART |
|
|
gary or ###-####; Phone #: ###-#### need to run condensate drain,s from cooler to a approved point of discharge as per upc 815.3 8/8/2002 11:19:02 AM
|
PLM02-02457
| Plumbing Rough-in | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | NR |
|
|
###-#### ROUGH IN ONLY
|
PLM02-02459
| Plumbing Rough-in | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | FAIL |
|
|
need to finish rough-in and test plumbing system water and drain,s 8/8/2002 1:35:09 PM
|
PLM02-02372
| Final | 8/1/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PASS |
|
|
###-#### paul \\water heater
|
PLM02-01540
| Roof Drains | 8/6/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/06/2002 at 15:11:51. Contact: . roof and overflow drain,s in area c test ok 8/8/2002 2:59:43 PM
|
PLM02-01666
| Final | 8/8/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/08/2002 at 08:14:56. Contact: ###-####.
|
PLM02-01606
| Final | 8/8/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/08/2002 at 08:16:05. Contact: ###-####.
|
PLM02-01181
| Final | 8/8/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/08/2002 at 08:42:11. Contact: ###-####. move expansion tank to cold water supply side of water heater oked temp 8/8/2002 5:48:46 PM
|
PLM02-02457
| Groundwork | 8/8/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | P | PASS |
|
|
|