BLD02-00292
| FIRE-Final Inspection | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/07/2002 at 15:11:38. Contact: ###-####. rated door not labeled; will have for structural inspector 8/8/2002 9:37:57 AM
|
MIS02-00192
| FIR-Final | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PASS |
|
|
early am ###-#### will have exit signs repaired for structural 8/8/2002 9:10:08 AM
|
FIR02-00250
| INSP-Conference | 8/8/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | P | PART |
|
|
###-#### met with Quality Electric about installation of duct detectors on the east unit; wanted to use the exception and install spot detectors in the rooms served by this unit; will have to resubmit through PDS plan review 8/8/2002 1:37:50 PM
|
BLD01-02848
| FIRE-Alarm Testing | 8/8/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | P | PART |
|
|
LES AND FINAL; Phone #: ###-#### okay to occupy/use the subfab HPM corridor and third floor corridors per letter from Earthtech 8/8/2002 4:21:21 PM
|
FIR02-00210
| INSP-Sprinkler Rough-in | 8/8/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | P | PART |
|
|
###-#### okay to cover 8/8/2002 2:33:09 PM
|
BLD01-01945
| FIRE-Sprinkler Rough-in | 8/8/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | P | PASS |
|
|
okay to cover; insulation complete
|
BLD02-00480
| FIRE-Final Inspection | 8/8/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | P | PASS |
|
|
|
FIR02-00246
| INSP-Supply line flush | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/07/2002 at 13:36:25. Contact: ###-####. stub out from footing okay; used rods at base and first 90 8/8/2002 4:22:19 PM
|