BLD01-03009
| BLD-Final | 8/6/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PASS |
|
|
terry; Phone #: ###-####
NOTE: THE DOWNSTAIRS IS NOT FINISHED AND SHOULD BE INSPECTED BEFORE COVER TO ENSURE DRAFT/FIREBLOCKS ARE IN 8/8/2002 11:29:16 AM
|
BLD01-03212
| BLD-Energy code compliance | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/07/2002 at 06:24:50. Contact: ###-####.
|
BLD02-01814
| BLD-Foundation | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PART |
|
|
###-####
wip 8/8/2002 9:39:06 AM
|
BLD02-01595
| BLD-Framing/Rough-in | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD02-01889
| BLD-Other | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/07/2002 at 13:35:32. Contact: ###-####.
framing ok after elec. pass 8/8/2002 10:30:07 AM
|
BLD02-01806
| BLD-Framing/Rough-in | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PART |
|
|
DUANE ###-####
ext. shear ok 8/8/2002 11:07:48 AM
|
MEC02-01281
| Final | 8/8/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PASS |
|
|
|