Inspections for the day of: Thursday, August 8, 2002.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01542 BLD-Final8/7/20028/8/20028/8/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 08/07/2002 at 17:23:57. Contact: . Cancell by contractor--will re-schedule. 8/8/2002 8:26:22 AM
BLD01-02679 BLD-Final8/7/20028/8/20028/8/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 08/07/2002 at 17:24:43. Contact: . Cancelled by contractor--will re-schedule. 8/8/2002 8:25:10 AM
BLD02-00613 BLD-Final8/7/20028/8/20028/8/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/07/2002 at 13:36:05. Contact: .C/N--Tempered glass required -- upstairs hallway bath. 8/8/2002 12:27:37 PM
BLD02-00971 BLD-Final8/7/20028/8/20028/8/2002 12:00:00 AMAPASS
BRIAN ###-#### GARAGE CODE # 8888 C. of C. #23299 issued. 8/8/2002 9:42:52 AM
BLD02-00578 BLD-Final8/7/20028/8/20028/8/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/07/2002 at 14:18:19. Contact: ###-####. C. of C. #23300 issued. 8/8/2002 10:19:49 AM
BLD02-00946 BLD-Conference8/7/20028/8/20028/8/2002 12:00:00 AMADONE
BLD02-00946 BLD-Final8/7/20028/8/20028/8/2002 12:00:00 AMAPASS
###-#### GARY C. of C. #23298 issued. 8/8/2002 8:57:04 AM
MEC02-01421 Final8/7/20028/8/20028/8/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/07/2002 at 16:14:15. Contact: ###-####. C/N on site. 8/8/2002 10:33:15 AM
BLD02-01693 BLD-Foundation8/7/20028/8/20028/8/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/07/2002 at 16:23:24. Contact: ###-####. wip- 8/8/2002 3:30:04 PM
MEC02-02115 Rough-in8/7/20028/8/20028/8/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 08/07/2002 at 15:13:40. Contact: ###-####. Cancelled by contractor 8/8/2002 4:55:39 PM
MEC02-02115 Pressure Test8/7/20028/8/20028/8/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 08/07/2002 at 15:13:57. Contact: ###-####. Cancelled by contractor. 8/8/2002 4:55:52 PM
MEC02-02017 Rough-in8/8/20028/8/20028/8/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/08/2002 at 07:40:59. Contact: ###-####.
BLD02-01137 BLD-Energy code compliance8/8/20028/8/20028/8/2002 12:00:00 AMPPART
bob ###-#### Ok to cover except garage--waiting on eng. in regards to beams in garage not per approved plans. 8/8/2002 2:43:51 PM
BLD02-01732 BLD-Footing8/8/20028/8/20028/8/2002 12:00:00 AMPPART
JED ; Phone #: ###-#### wip--85% ready 8/8/2002 3:45:19 PM
MEC02-01606 Final8/8/20028/8/20028/8/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/08/2002 at 09:14:41. Contact: ###-####.
BLD02-01723 BLD-Footing8/8/20028/8/20028/8/2002 12:00:00 AMPDONE
JIM; Phone #: ###-#### Footings for house and garage. No approved plans on site--verified rebar pinned to basement walls. Basement floor just poured-talked to flatwork contractor--no rebar on point loads were installed--contractor was starting to install prior to concrete setting up--pour at own risk. 8/8/2002 1:17:28 PM
BLD01-01945 BLD-Energy code compliance8/8/20028/8/20028/8/2002 12:00:00 AMPPASS
###-#### Ok to cover pending fire ok 8/8/2002 4:25:49 PM