FIR02-00277
| INSP-Sprinkler Rough-in/Hydro | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | FAIL |
|
|
sprinkler head in entry is overspaced 8/8/2002 11:25:36 AM
|
BLD02-00500
| FIRE-Final Inspection | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | PASS |
|
|
fire life/safety finaled 8/8/2002 2:51:07 PM
|
BLD02-00137
| FIRE-Final Inspection | 8/7/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | A | FAIL |
|
|
provide tamper switches on the valves for the fire pump and the fire sprinkler riser.These switches are to be monitored by the fire alarm system. The bypass valve for the fire pump is in the open position. Provide information as to why and close the valve. Provide supervision of the new duct smoke detector by the fire alarm panel. Provide approved fire alarm drawings for items 1 and 4 on the correction notice. Sprinkler heads in the phone room and the radio room are overspaced. Verify beam blockage in radio room 8/8/2002 11:24:16 AM
|
BLD02-00567
| FIRE-Supply Line Flush | 8/8/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | P | PASS |
|
|
This inspection done under FIR02-00061 8/8/2002 3:41:47 PM
|
FIR02-00061
| INSP-Supply line flush | 8/8/2002 | 8/8/2002 | 8/8/2002 12:00:00 AM | P | PASS |
|
|
flush OK
|