ELE03-01364
| ELE-Aging Inspection | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | | PASS |
|
|
|
ELE02-01013
| ELE-Aging Inspection | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | | CANC |
|
|
WSUC 8/8/2003 4:19:03 PM
|
ELE03-02279
| Electrical Rough-In | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 12:04:53 PM. r/i ok 8/8/2003 9:02:59 AM
|
ELE03-01917
| Final | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 12:51:02 PM. Contact: ###-####. ok 8/8/2003 9:03:23 AM
|
ELE03-02408
| Final | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | FAIL |
|
|
1)We installed a 100amp power pedestal beside the Idaho Power pad-mount transformer in the Common Area of the condo complex, along with 2 ground rods.
2)We mounted a back-board beside this pedestal and ran a 20amp 120volt ckt.to it for a weatherproof GFCI receptacle.
3)We ran a 20amp 220volt ckt.to the back-board for a pump-start relay and a manual over-ride switch for the sprinkler pump.
3)We ran the pump ckt. in IMC out to the pump location and installed a 20amp 220volt single weatherproof receptacle for the pump.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell cor. posted called 250.8, 314.3, 110.3(B) no sq d breakers allowed 8/8/2003 11:09:45 AM
|
ELE03-02409
| Final | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PASS |
|
|
We extended an existing 120volt ckt. to a new weatherproof GFCI receptacle in the Wash Bay. The manager's name is Phil.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok 8/8/2003 8:12:37 AM
|
ELE03-02387
| Electrical Rough-In | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | FAIL |
|
|
Inspection for cover please//###-#### harold
cor. posted called 300.4, 404.9&404.12, 300.12, 300.12, 250.148, 300.14, all make up shall be complete COW
8/8/2003 9:58:02 AM
|
ELE03-02419
| Electrical Rough-In | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PART |
|
|
###-#### shawn new rest rms only 8/8/2003 12:10:34 PM
|
ELE03-02414
| Electrical Rough-In | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | FAIL |
|
|
HAROLD; Phone #: ###-#### Internet Inspection Request from: Darla Downs cor. posted called see PM#ELE03-02387 for info
COW 8/8/2003 9:58:58 AM
|
ELE03-01280
| Final | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/8/2003 at 8:16:41 AM. Contact: ###-####. ok card signed 8/8/2003 3:10:21 PM
|
ELE03-01902
| Permanent Service | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | NR |
|
|
emmett; Phone #: ###-#### Internet Inspection Request from: Barbara Moore nr called no p/s cover for electrode electrode not installed 8/8/2003 2:12:15 PM
|
ELE03-02031
| Final | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/8/2003 at 9:05:51 AM. Contact: ###-####. ok no card at job site 8/8/2003 12:57:39 PM
|