PLM03-02435
| Plumbing Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PART |
|
|
frank ###-#### south breakroom sink above the floor 8/8/2003 9:18:33 AM
|
PLM03-02409
| Final | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Linda Hartwell final ok 8/7/2003 5:23:55 PM
|
PLM03-02443
| Plumbing Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PASS |
|
|
###-#### paul ri ok 8/8/2003 9:44:10 AM
|
PLM03-02021
| Plumbing Rough-in | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/8/2003 at 7:58:17 AM. Contact: ###-####. ri ok 8/8/2003 3:24:57 PM
|
PLM03-00088
| Final | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Liz Sasser 8/8/2003 2:35:54 PM open front seats on wc, hook up equipment, certifymed gas system, access to slip nuts and fixture supplies on hand sinks, screen intake and exhaust, add lables to med gas system, need med gas system alarm set, verify deveations to approved med gas plans and letter with quantum eng., resubmit plan showing all changes to approved drawings. 8/8/2003 2:40:54 PM
|
PLM03-02403
| Plumbing Rough-in | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Liz Sasser ri ok 8/8/2003 4:10:35 PM
|
PLM03-02455
| Plumbing Rough-in | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | FAIL |
|
|
###-#### nancy install a water heater pan under water heater upstairs, pipe drain outside , tests ok, 8/8/2003 3:53:03 PM
|