BLD02-00384
| BLD-Aging Inspection | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | | DONE |
|
|
superceded by t/i 8/8/2003 11:48:17 AM
|
BLD02-00437
| BLD-Aging Inspection | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | | DONE |
|
|
called, no response 8/8/2003 2:51:59 PM
|
BLD02-00365
| BLD-Aging Inspection | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | | DONE |
|
|
shows finalled...card??? 8/8/2003 11:47:58 AM
|
BLD02-00370
| BLD-Framing/Rough-in | 8/6/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/6/2003 at 2:54:05 PM. ...HD rods ok at all of 2nd floor ( "stud packs" per plan), 3rd floor nailing appears ok, blocked diaphragm installed...eng's ok for plbg blockouts at that area pending; ok for gypcrete at 3rd fl. 8/11/2003 8:04:02 AM
|
BLD03-01568
| BLD-Framing/Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 8:30:46 AM. Contact: ###-####....brace walls to deck, need elec walls ok 8/8/2003 10:42:31 AM
|
BLD02-00090
| BLD-Framing/Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | NR |
|
|
alan, expansion joint info...mfr's spec doesn't show 5" gap for 2hr system....resubmit 8/8/2003 11:52:13 AM
|
BLD03-01823
| BLD-Final | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | NR |
|
|
BERNIE; Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
|
BLD03-01063
| BLD-Framing/Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 7:14:15 PM. Contact: ###-####....nail shear panels & sills per plan, obtain hvac ok; no further insp. 8/8/2003 11:51:16 AM
|
BLD03-01417
| BLD-Framing/Rough-in | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | PART |
|
|
Wendy...need consult fire insp re smoke detectors 8/12/2003 10:05:05 AM
|
BLD03-01563
| BLD-Footing | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 10:28:29 AM. Contact: ###-####.
|
BLD03-01563
| BLD-Footing | 8/7/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 8/7/2003 at 10:28:29 AM. Contact: ###-####.
|
BLD03-01823
| BLD-Footing | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | NR |
|
|
nr @ 2:20...recall 8/8/2003 2:50:02 PM
|
BLD02-03103
| BLD-Final | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | NR |
|
|
need as late as possible still waiting on fire and elec.\\###-####
|
BLD03-01060
| BLD-Framing/Rough-in | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | PART |
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...ok to cover walls, patch floor/clg & walls for 1hr const as req'd...continuous gypsum req'd 8/8/2003 2:51:14 PM
|
MEC03-02136
| Conference | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 8/8/2003 at 9:04:40 AM. Contact: ###-####....called, wrong #? 8/8/2003 4:40:25 PM
|
BLD02-00090
| BLD-Conference | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | PASS |
|
|
still need joint detail as req'd 8/8/2003 2:58:18 PM
|
BLD02-00370
| BLD-Framing/Rough-in | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | PART |
|
|
2nd, 8/8/2003 4:51:15 PM
|
BLD03-00430
| BLD-Framing/Rough-in | 8/8/2003 | 8/8/2003 | 8/8/2003 12:00:00 AM | P | PART |
|
|
allison; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...need gas test...ok to insul only 8/8/2003 4:52:17 PM
|